Key Highlights
- Recovered laboratory data from a 220-sample 2022 soil survey has defined two priority target areas at the Big It Tungsten Project in Idaho.
- Peak values included 687.6 ppm arsenic, 20.9 ppm antimony and 594.1 ppb gold.
- Four samples exceed working thresholds for all three elements, with a further 10 above two thresholds.
- The project is a past-producing high-grade tungsten mine with concentrates of about 67% to 75% WO3 shipped in the past.
QEM Limited (ASX:QEM) announced on 17 November 2026 the first results of a staged Phase 1 programme at its Big It Tungsten Project in Idaho, United States. The company reviewed and validated a 2022 soil geochemistry dataset, which had not been available at its August post-acquisition review, and defined two priority target areas for follow-up.
Soil Geochemistry Results
The laboratory-certified dataset for the 220-sample soil survey has been recovered. The company reports spatially coherent arsenic-antimony anomalism, with an additional zinc-lead response within Priority 1. Peak values reached 687.6 ppm arsenic, 20.9 ppm antimony and 594.1 ppb gold.
Four samples exceed working thresholds for all three elements and a further 10 exceed two thresholds, according to the announcement.
Project History and Metals
The Big It project is described as a past-producing high-grade tungsten mine that shipped concentrates of about 67% to 75% WO3 to United States wartime programmes. The company says the project is largely untested by modern exploration.
The company links its exposure to tungsten and antimony to Supply chain concerns. It notes that China accounts for about 83% of global tungsten production, and that the United States relies on imports for about 91% of its antimony.
Next Steps
The announcement describes the first Phase 1 output as the start of a staged programme launched in October. The company says the two priority areas define follow-up exploration, but does not state a budget or drilling timetable.
Sector Context and Risks to Watch
Soil anomalies of arsenic and antimony can reflect a range of mineral and background sources, and they need field follow-up and sampling before a target is confirmed. Historic data from an earlier survey also depends on its laboratory quality, which the company says is now certified.
The main risks are the outcome of follow-up work on the two priority areas, the cost of the staged programme and the company's reliance on historical data. The announcement also carries a release date of 17 November 2026 while its cover page shows a September 2025 date, which shareholders may wish to check.
Final Word
QEM has recovered and validated a soil dataset that defines two priority areas at Big It, and the next stage of work will test those anomalies in the field. Future updates are expected to report the follow-up programme and any further geochemical results.






Please wait processing your request...