  • Polymetals Resources (ASX:POL) began development towards the Upper Main Lode at its Endeavor mine.
  • The lode’s Mineral Resource contains 1.6 million tonnes grading 234 grams per tonne silver.
  • Endeavor produced 230,256 ounces of silver in the September 2026 quarter.
  • Ventilation work and the shift to contract labour contributed to a production shortfall.

Polymetals Resources (ASX:POL) has started underground development towards the Upper Main Lode at Endeavor, its silver, zinc and lead mine in New South Wales. The mine plan targets first ore from the lode in the December quarter, following a September period in which ventilation work and a change in Mining crews interrupted production.

Mine development moves towards the lode

The Upper Main Lode Mineral Resource is estimated at 1.6 million tonnes grading 234 grams per tonne silver, 8.5% zinc and 6.0% lead. The estimate gives Polymetals a basis for designing access and scheduling work as it advances development towards the new mining area.

The company commenced development towards the lode in October. At the September-quarter update, its target was first ore in the December quarter. Developing access and reaching the ore are separate milestones from processing it and recovering saleable metal.

A disrupted September quarter

Endeavor processed 68,334 tonnes of ore and produced 230,256 ounces of silver, 1,714 tonnes of zinc and 1,146 tonnes of lead in the three months to 30 September. Polymetals linked the production shortfall to an underground suspension for ventilation work and disruption during the transition to a contract mining workforce.

The company’s December-quarter plan called for 105,000 to 115,000 tonnes of ore processing and more than 350,000 ounces of silver production. Those were operating targets. Delivery depends on improving underground output and keeping feed available for the processing plant.

How much cash is available for operations

Polymetals reported A$35.4 million in cash at the September quarter end. A$28 million was restricted as security for the rehabilitation bond, leaving A$7.4 million unrestricted. Debt stood at A$18.1 million.

The restricted portion is important when assessing liquidity. It is held as security and has a different role from cash available for wages, equipment or underground development. The rate of production recovery therefore matters to cash generation alongside the reported cash balance.

Planning the December quarter

Polymetals said it was preparing an updated Ore Reserve estimate for Endeavor alongside the work to access the Upper Main Lode. A reserve update incorporates practical mining and economic assumptions into production planning. How quickly the mine secures reliable feed after the September disruption will also affect the December quarter independently of the estimate. The company has been completing ventilation upgrades and moving underground mining to a contract workforce.