Key Highlights

  • Rock chip sampling at Everleigh returned gold assays of 3.26g/t Au,

2.45g/t Au and 1.84g/t Au associated with sulphide-bearing quartz veins.

  • Stage 1 RC drilling has completed 8 holes for approximately 1,200

metres, with assay results expected from December through January 2027.

  • Shares surged 26.67% to \$0.019 during trading on 26 November 2026,

well ahead of the S&P/ASX 200\'s 0.63% gain.

Iceni Gold Limited (ASX:ICL), a gold exploration company focused on the Eastern Goldfields of Western Australia, saw its shares jump 26.67% to \$0.019 during the Trading session on 26 November 2026. The S&P/ASX 200 index (XJO) advanced 0.63% to 8,747.50 points on the same day. The company recently reported new surface sampling results and a drilling progress update from its Everleigh Farm-In project, which sits within Iceni\'s flagship 14 Mile Well Gold Project between Leonora and Laverton. The Everleigh Farm-In is funded by a \$10 million option and joint venture exploration agreement with Gold Fields Australia.

Encouraging Rock Chip Results at ET2 and ET3

On 19 November 2026, Iceni announced that recent fieldwork and rock chip sampling at the ET2 and ET3 target areas at Everleigh returned encouraging gold assays. Results included 3.26g/t Au, 2.45g/t Au and 1.84g/t Au, with anomalism associated with sulphide-bearing quartz veins within the Bellbird Dolerite Sill. The company noted that the new rock chip results strengthen the geological targeting model, with higher-grade gold occurrences spatially associated with a prominent magnetic horizon within the Bellbird dolerite unit.

Stage 1 RC Drill Programme Progressing

The Stage 1 reverse circulation (RC) drill programme is underway at Everleigh, with 8 holes for approximately 1,200 metres completed at the time of the announcement. Drilling at the ET1 target, which hosts the Wild West Trend, has successfully intersected the prospective Bellbird dolerite. The first samples have been dispatched to the laboratory, with assay results expected progressively from December through to January 2027. A heritage survey has approved clearing of drill sites on ten drill traverses to support a planned 50-hole, approximately 7,000-metre Stage 1 RC programme.

Gold Fields Farm-In Provides Funding Support

All exploration and drilling activities at Everleigh are fully funded by Gold Fields under the \$10 million Everleigh Farm-In, Option and Joint Venture Agreement, which commenced on 30 June 2026. This arrangement covers a 48 square kilometre package of tenements and allows Iceni to focus its own resources on other high-priority targets such as Goose Well on its 100%-held non-JV tenements covering approximately 270 square kilometres.

Sector Context

Gold exploration in Western Australia\'s Eastern Goldfields continues to attract attention, particularly around the Leonora-Laverton corridor. The Bellbird Dolerite Sill has become a focus for Iceni and Gold Fields, as the dolerite units in this region have historically been associated with gold mineralisation. The integration of surface geochemistry, geological mapping and aeromagnetic interpretation is a standard approach in the region for refining drill targets.

Risks Investors Are Watching

The key near-term risk is the pending assay results from the RC drilling programme. While visual observations of quartz-carbonate veining and sulphides are considered positive indicators, laboratory assays will ultimately determine economic significance. Additionally, the broader 50-hole Stage 1 programme remains in its early stages, and further results may take several months to materialise. The company\'s reliance on the Gold Fields farm-in for Everleigh funding means any changes to that arrangement could affect the pace of exploration.

What Comes Next

Assay results from the first completed holes are the most immediate catalyst, expected from December 2026 through January 2027. The ongoing RC programme will continue to test priority targets across the Everleigh Farm-In area. Beyond Everleigh, Iceni\'s exploration strategy on its broader 14 Mile Well Gold Project, including the Goose Well prospect, will also be in focus for investors.

Frequently Asked Questions (FAQs)

assays of 3.26g/t Au, 2.45g/t Au and 1.84g/t Au.

activities at Everleigh under a \$10 million farm-in, option and joint venture agreement.

progressively from December 2026 through to January 2027.