Key highlights

  • Almasar Minerals (ASX:AMK) shares rose 12.50% to $0.18 during the Trading session on 26 November 2026, while the S&P/ASX 200 gained 0.76%.
  • Ground magnetics started at Wadi Halibi, where eight target areas were identified on granted licences.
  • Seven Auction 10 applications covering 659 km2 are targeted for grant in the first half of 2027.

Almasar Minerals (ASX:AMK) shares rose 12.50% to $0.18 during the trading session on 26 November 2026, while the S&P/ASX 200 index was up 0.76% at 8,758.60. Almasar Minerals is an explorer with licences in Saudi Arabia targeting gold and copper-gold systems. It announced the start of ground magnetics on 26 November 2026, the same day as the share price move.

Ground Magnetics and Equipment

Almasar began ground magnetic surveys using equipment it imported itself, starting at Wadi Halibi with eight target areas identified on granted licences. Auger rigs are being imported, with drilling to start once they arrive, aimed at priority targets along strike from active artisanal mining.

In-house assay equipment has shipped, with set-up targeted for the first quarter of 2027 after auger drilling starts. Exploration is planned on a low-cost basis with a consistent in-house approach.

Granted Licences

The company holds 420 km2 of granted licences. The Southern Cluster permits ND28, ND31 and ND36, covering 236 km2, lie on the Ad Duwayhi, Wurshah and Umm Matirah gold belt, which hosts the Ad Duwayhi gold mine at 3.1 million ounces at 1.3 g/t gold. Five areas are targeted for geophysics, with Wadi Halibi the highest priority.

The northern permit NS142, covering 90 km2, lies on the 275-kilometre Sukhaybarat-Shabah corridor and is prospective for VMS, skarn copper-gold and magmatic-hydrothermal systems, with priority targets at JJ West, Mawiyah and A4. The ND41 licence covers 94 km2, with follow-up mapping moved from the fourth quarter of 2026 to the first quarter of 2027.

Pending Auction Applications

Almasar was the sole bidder for seven exploration licence applications under Auction 10, covering a further 659 km2, with granting targeted for the first half of 2027. The company noted that an uncontested bid does not assure a successful outcome and that grant and timing remain subject to the requisite process.

Two reconnaissance permit applications are in process, one targeted for grant in the fourth quarter of 2026 and another in the first quarter of 2027, allowing mapping, geophysics and surface sampling but not drilling ahead of grant. NS301 on the Dhib Corridor is the highest priority.

Sector Context

Saudi Arabia has been opening new areas to mineral exploration through licensing rounds, and explorers target belts that host existing gold mines. Early programs rely on mapping, geophysics and soil sampling before drilling.

Risks Investors Are Watching

Licence grants from the auction are not assured and timing is uncertain, equipment imports are a gating item for drilling, and results from early-stage surveys may not lead to discoveries. The company is exploring in a single jurisdiction.

What to Watch Ahead

Attention is on Import of the auger rigs, results of the Wadi Halibi magnetics, the reconnaissance permits and the grant of Auction 10 licences.

Closing Perspective

Almasar's update described the start of field work and equipment imports across its licence package. It was released on 26 November 2026, the same day shares rose during the trading session.