Key Highlights
- Alligator Energy (ASX:AGE) closed at $0.03, down 3.23%, on 26 October 2026.
- New mineralisation was intersected about 1 km south of the previous southernmost Blackbush hole.
- BBRM26-590 returned 5.2 m at 0.15% eU3O8 and BBRM26-592 returned 6.6 m at 0.12% eU3O8.
Alligator Energy Ltd (ASX:AGE) closed at $0.03, down 3.23%, in the Trading session on 26 October 2026, while the S&P/ASX 200 closed at 8,809.9, up 0.17%, and the S&P/ASX 200 Energy index gained 0.92%. Alligator is an Adelaide-based uranium explorer whose main project is the Samphire Uranium Project in South Australia.
Drilling Results Announced on 7 October 2026
Alligator reported results from the southern extension of the Blackbush deposit at Samphire. Recent drilling extended the interpreted mineralised trend by about 1 km, with mineralisation open at both ends of the newly tested trend. Two adjacent holes about 100 m apart returned intersections above the 250 ppm eU3O8 cut-off: BBRM26-590 with 5.2 m at 0.15% (1,498 ppm) eU3O8 from 64.7 m, and BBRM26-592 with 6.6 m at 0.12% (1,245 ppm) eU3O8 from 62.7 m.
The company said the holes confirm continuation of the channel in a previously untested section of the Blackbush-Plumbush corridor. More than 9,000 m of drilling across 91 holes has been completed under the Samphire Growth Strategy since the previous update.
Plumbush and Reporting Basis
At Plumbush, the first modern drilling by Alligator is returning results consistent with the historical drilling that underpins the existing Inferred Mineral Resource. All widths are downhole, and equivalent uranium grades are derived from calibrated downhole natural Gamma logging rather than chemical assays.
The announcement includes an appendix of material drill-hole information and a JORC Table 1 disclosure. Alligator describes the Samphire Growth Strategy as the framework for the drilling, and the previous update, released on 28 July 2026, reported mineralisation extending south of Blackbush.
About Alligator Energy
Alligator Energy Ltd is based at Unley, South Australia. For an in-situ recovery project such as Samphire, its chief executive said the key question is how large an area of the channel is mineralised above cut-off.
The chief executive described the step-out as exciting and as evidence of the potential scale of the mineralised system south of Blackbush.
Risks and Catalysts on Watch
The grades reported are gamma-derived equivalents, and drilling continues across the Blackbush-Plumbush corridor and Plumbush. Further results from the program are the next scheduled disclosures.
Wrapping Up
Alligator extended mineralisation about 1 km south of Blackbush. The shares closed down 3.23% on 26 October.






Please wait processing your request...