Key Highlights
- Prominence Energy (ASX:PRM) said a CSIRO study detected hydrogen in all 28 successfully analysed rock samples at its Eyre Peninsula Project.
- Two potential hydrogen generation mechanisms were identified: radiolysis in uranium and thorium-enriched rocks and reactions in iron-bearing rocks.
- The highest hydrogen amount was 7.72 mmol/kg of rock from a quartz vein in the Tunkillia Suite.
- The company is targeting a mid-2027 exploration drilling campaign.
Prominence Energy Limited (ASX:PRM) announced results from its CSIRO Kick-Start study on 4 November 2026, reporting that hydrogen was detected in all 28 successfully analysed rock samples from the Eyre Peninsula Project in South Australia. The study also identified potential source rocks and a potential seal rock. The company said the results do not establish current hydrogen generation rates, a subsurface accumulation or commercial recoverability.
Hydrogen Detected in Fluid Inclusions
The samples were crushed to release gases trapped in fluid inclusions, and all 28 successfully analysed samples released hydrogen. The highest amount, 7.72 mmol/kg of rock, came from a quartz vein in the Tunkillia Suite. The company said the results are consistent with hydrogen-bearing fluids having circulated through different basement rock units in the past, while the timing of that circulation is unconstrained and the findings do not demonstrate a present-day flux.
Prominence is an exploration company targeting natural hydrogen at its Eyre Peninsula Project in South Australia. The company said CSIRO identified elements compatible with a hydrogen system, including prospective source rocks, migration pathways and potential sealing formations, and that it is interpreting the study to progress toward higher-priority drilling targets.
Two Potential Generation Mechanisms
CSIRO identified uranium and thorium-enriched felsic rocks of the Hiltaba Suite, particularly the Cultana Subsuite, as candidates for radiolytic hydrogen generation, where radiation splits water. Cultana samples recorded uranium of up to 50.9 ppm and thorium of up to 142.5 ppm. A second mechanism involves oxidation of reduced iron (Fe²⁺) in reactions between water and iron-bearing rocks. The Sleaford Complex chlorite schist contained 8.39% Fe²⁺ by weight, with further reduced-iron potential in Tunkillia dolerites and Hiltaba-associated metagabbros. The company noted that future generation depends on suitable conditions and access to water and that the study did not quantify present-day rates.
Seal Rock and Target Selection
One Gawler Range Volcanics sample recorded very low permeability, which CSIRO flagged as a potential seal rock. The regional extent and integrity of any seal have not been assessed. Prominence said source-rock characteristics, faults, fractures and potential volcanic cover can now be assessed together to rank exploration targets where hydrogen sources, migration pathways and trapping conditions may coincide.
Drilling Plans
The company is targeting a mid-2027 exploration drilling campaign, with the independent results supporting target selection and prospective farm-out discussions. Chief Operating Officer Dr Krista Davies said the team can now interpret the findings to inform exploration targets.
Further work is needed to determine whether source rocks, migration pathways and effective traps coincide at a drillable location. Target ranking, farm-out discussions and the mid-2027 drilling timetable are the items to follow.
The company said the single sealing candidate is a Gawler Range Volcanics sample, and that preliminary petrophysical tests indicate part of that unit may have the low permeability needed for a sealing system. Further work is required to test whether prospective source rocks, migration pathways and effective traps coincide at a drillable location.
In summary, the CSIRO results add geological information on potential hydrogen sources and sealing rocks at Eyre, while the company stresses they do not show a current accumulation.






Please wait processing your request...