Key Highlights
- Macallum New Energy (ASX:MNE) shares were 5.88% lower at $0.16 during the 27 November 2026 session.
- Aztech Well Construction was appointed for well planning across three prospects in EP 494.
- A binding farm-out agreement is targeted for the first quarter of 2027, with drilling in the second half of 2027.
Macallum New Energy Limited (ASX:MNE) shares were trading 5.88% lower at $0.16 during the Trading session on 27 November 2026, while the S&P/ASX 200 index was at 8,795.50, up 0.36% or 31.70 points. Separately, the company released an announcement on 12 November 2026 on well planning and the farm-out process for its 100% owned EP 494 permit in the onshore Perth Basin, Western Australia.
Well Planning Appointment
The company appointed Aztech Well Construction to undertake well planning for the Barberton Terrace Deep, Gadee East and Aberfeldy prospects in EP 494. The Environmental Plan and regulatory approvals have started.
The appointment forms part of preparations for drilling and supports the farm-out process.
Aztech is described in the announcement as a well engineering and well project management provider with long experience in the Perth Basin, including involvement in the Waitsia and Lockyer gas fields. The company said the awarded scope sits on the critical path for drilling one or more wells in the second half of 2027.
The regulatory work includes developing the drilling Environmental Plan, Safety Management Systems and commencing land access consultations. Chief Executive Andy Furniss said initiating the well engineering studies now means all three potential well locations will be ready for a final Investment decision within the first quarter, allowing the company to move quickly to secure a rig slot and purchase long-lead items.
Farm-Out and Timetable
A farm-out process is under way, with a binding farm-out agreement targeted for the first quarter of 2027. The final investment decision window is also the first quarter of 2027, with drilling in the second half of 2027.
MNE holds 100% of EP 494 in the Perth Basin.
The company said it is encouraged by strong interest in the permit, with multiple top-tier parties active in the farm-out process, which is expected to run until the end of 2026 but may be extended if there is additional demand. The specific choice of wells will be decided after a joint venture is formed.
The announcement states that the work will run in parallel with the farm-out so that any new joint venture can deliver one or more exploration wells in the second half of 2027. Final selection of well targets is to be made after a binding farm-out agreement is signed.
Permit and Prospects
EP 494 contains the three prospects named in the announcement, which the company regards as its drilling candidates. Well planning covers design, regulatory submissions and logistics ahead of drilling.
The announcement was released on 12 November 2026.
Barberton Terrace Deep is a large three-way structural trap targeting gas in Permian reservoirs, with a secondary Triassic target. The company reported a 2U Prospective Resource of 1,090 PJ of sales gas, a maximum closure of about 152 km2 and a structural CREST at about 4,250 m, mapped 250 m shallower than previously imaged. A land access agreement has been signed for the BTD-1 location.
Gadee East and Gadee West are fault-bounded closures targeting gas and oil in stacked Jurassic sands of the Yarragadee Formation, with a combined mean of 221 PJ of sales gas following a 117 km2 3D seismic survey. Aberfeldy is a fault-bounded closure of about 16 km2 with a crest at about 2,100 m and is described as the company’s first oil prospect.
The prospective resource volumes were independently estimated by Molyneux Advisors Pty Ltd under SPE-PRMS (2018) using probabilistic methods, are unrisked and are 100% net to the company. The announcement carries a cautionary statement that the quantities relate to undiscovered accumulations and that further exploration, appraisal and evaluation are required to determine the existence of significant quantities of potentially moveable hydrocarbons.
Sector Context
The onshore Perth Basin is an established gas-producing region in Western Australia, with infrastructure and domestic gas Demand supporting exploration. Explorers often farm out part of a permit to share the cost of drilling.
Risks Investors Are Watching
A farm-out is not assured, and the timetable depends on approvals and market conditions. Exploration wells can be unsuccessful, and drilling costs are significant for small companies. Shares can move sharply in a session.
What to Watch Ahead
Items cited include progress on the Environmental Plan and regulatory approvals, a binding farm-out agreement in the first quarter of 2027, and drilling in the second half of 2027.
Closing Perspective
Macallum’s shares fell in the session, while its latest announcement described well planning and a farm-out process for EP 494.




_11_26_2026_09_15_12_447191.jpg)

Please wait processing your request...