Key Highlights

  • Connected Minerals reported more than 80 metres at 1.5% niobium pentoxide from surface in each of its first two Bailundo holes.
  • BADD26_001 included 22.35 metres at 3.01% niobium pentoxide from 16.80 metres within the weathered carbonatite.
  • BADD26_002 returned 58.45 metres at 1.12% niobium pentoxide from 24.75 metres in underlying variably weathered carbonatite.
  • About 63% of the planned first-pass holes at the central and southern target were complete, with five more holes awaiting assays.

Connected Minerals (ASX:CML) has reported the first diamond drilling assays from its Bailundo niobium and rare earth carbonatite project in Angola, where it holds an 80% interest. The first two holes intersected niobium from surface to their final depths. The company designed the initial program to evaluate near-surface mineralisation at the central and southern niobium target.

The first two Bailundo assay profiles

BADD26_001 returned 81.6 metres grading 1.5% niobium pentoxide from surface to the end of the hole. Within that interval, the first 53.20 metres graded 2.02%. A section of 22.35 metres from 16.80 metres averaged 3.01%, including 4.02 metres at 4.12% from 21.15 metres.

BADD26_002 returned 83.2 metres at 1.5% niobium pentoxide, also from surface to the end of the hole. The upper 25.75 metres graded 2.41%, including 17.75 metres at 3.01% from eight metres. That interval included 1.90 metres at 4.02% from 18.70 metres. The lengths are reported downhole. Across the two holes, all 165 primary core samples exceeded the reporting threshold of 0.20% niobium pentoxide. The minimum individual sample grade was 0.46%. The company calculated higher-grade composites and geological domain averages using different interval boundaries.

Testing the historic results and deeper rock

The company drilled BADD26_001 about seven metres from the collar of historical hole SB02 to compare grades and interval positions. The historical dataset that informed the program includes 10 diamond holes for 3,414.4 metres, 1,089 soil samples and 458 rock-chip samples, as well as maps and core records. Connected Minerals reported comparable grades, lengths and downhole positions for zones of higher-grade mineralisation. It said the new hole tested a shallower section than the historical drilling, which encountered mineralisation down to 205.5 metres. Historical SB02 returned 205.5 metres at 1.0% niobium pentoxide from surface to its end.

Both new holes intersected niobium in the weathered carbonatite near surface. The company also reported mineralisation in the underlying iron-rich carbonatite. The second hole included 58.45 metres at 1.12% niobium pentoxide from 24.75 metres, an interval that extended below the upper weathered zone. Connected Minerals considers the mineralisation open at depth.

How the drill grid was selected

The company began the campaign in September 2026 after reviewing historical drilling, surface geochemical sampling and ground geophysical survey results. Historical sampling identified 118 soil samples showing at least 0.5% niobium pentoxide across the central and southern parts of the complex. Subsequent validation sampling returned values as high as 1.92% in the southeastern part of the area.

The first-pass holes are spaced on a nominal 200-metre grid. The program combines selected twin holes with systematic drilling to examine grade distribution and geological controls. Subject to results and operating conditions, Connected Minerals plans to follow up with infill drilling on a nominal 100-metre grid.

The next set of Bailundo results

At the time of the update, approximately 63% of the planned first-pass holes in the central and southern area had been completed. Samples from five more holes had reached the laboratory, with results expected in mid-December 2026. The two reported holes cover part of a carbonatite complex measuring approximately seven kilometres across. Dedicated drilling on the northern rare earth target had yet to begin.