A larger gold reserve is giving Catalyst Metals a longer runway for its ambitions in Western Australia. Catalyst Metals (ASX:CYL) lifted Ore Reserves at the Plutonic Gold Belt to 2.0 million ounces, strengthening the foundation for a proposed production increase while mine development, processing capacity and project timing remain critical to delivery.

The Latest Development: reserves at 2.0Moz

Catalyst reported Ore Reserves of 2.0 million ounces (23.4 million tonnes at 2.6 grams per tonne gold) at 30 June 2026, up 35% from 1.5Moz a year earlier,. The reserves were calculated at a gold price of A$4,500 an ounce and are classified as Probable.

The Trident underground reserve is 3.9 million tonnes at 4.2g/t for 524,000 ounces. A separate 448,000-ounce Inferred resource sits alongside it, and Inferred material is not a reserve. Group Mineral Resources of 5.1Moz are a different measure.

Why it matters: a mine plan needs reserves behind it. The company says the larger base cuts the annual reserve-replacement burden from about 600,000 ounces to about 200,000 ounces. In our reading, that shifts the debate from whether Catalyst can keep its plant fed to whether it can build and run the mines on time.

What the company does

Catalyst is a gold producer. Its Revenue comes from selling gold, so Earnings track the gold price in Australian dollars and the All-In Sustaining Cost (AISC) of each ounce. The company operates the Plutonic Gold Belt in Western Australia, feeding a central processing plant. It has no reported copper or other by-product revenue in the material reviewed.

K2 entered commercial production in the June 2026 quarter, becoming the fourth mine feeding the central Plutonic plant, the company said. The Trident open pit was completed in May 2026, and the Trident underground decline is being developed.

Latest operating results

For the June 2026 quarter, Catalyst reported record Plutonic production of 31,886 ounces at an AISC of A$2,666 per ounce produced. For FY26 it produced 103,761 ounces, inside its 100,000 to 110,000 ounce guidance.

FY26 AISC was A$2,738 per ounce sold. Guidance was A$2,750 to A$2,950, so the outcome was marginally below the range, which for a cost measure is the favourable side. Secondary sources describe this inconsistently, so check the primary report.

Cash and bullion reached A$331 million at 30 June 2026, up A$54 million in the quarter. Operating Cash Flow was A$85 million. The company has no drawn Debt and an undrawn A$100 million facility, giving total Liquidity of A$431 million. Quarterly outlays included A$9 million on growth projects, A$4 million on non-discretionary Capital and A$13 million on exploration. The summary did not reconcile these items with the A$54 million cash build.

Growth projects

The company’s growth case rests on several sources of ore:

Trident underground: first stoping ore is expected in the first half of calendar 2027, with average production targeted at 60,000 to 80,000 ounces a year.