Top 10 ASX Dividend Stocks for Nov 2026 Download Free Report
• Aspire signed a US$69.9 million contract covering the Ovoot coal handling and preparation plant and Erdenet rail terminal infrastructure.
• Ampol's 1H 2026 RCOP EBIT rose 245% to $1,391.7m on a Lytton Refiner Margin averaging US$28.26 per barrel.
• Managed run-of-mine production reached 11.0 million tonnes in the September quarter, up 3% on the June quarter.
• Energy Markets underlying EBITDA climbed to $1,701 million from $1,404 million as cost to serve fell to $642 million.
In its third quarter report released on 21 October 2026, Woodside said Sangomar achieved an average production rate of 94 Mbbl/d on a 100% basis, with reliability of 99.2%. The rate reflects natural field decline and reduced production sharing contract entitlement after Woodside recovered …
The FID has been taken on the Etango-8 design, which involves conventional open pit mining and heap leach processing at 8 million tonnes per annum, with forecast average annual production of about 3.5 Mlbs U3O8. A 2024 Scoping Study indicated the potential to expand …
Equus executed a binding conditional 10-year Gas Sales Agreement with Alcoa of Australia, establishing Alcoa as the project’s foundation domestic gas customer. The agreement provides for about 50 TJ/day of domestic gas following project start-up, equivalent to about 182 PJ over the term, and …
Queensland managed ROM production was 5.5Mt, down 4% on the June quarter. Blackwater produced 4.1Mt, in line with the prior quarter, while Daunia produced 1.4Mt as a new box-cut began. Queensland equity sales fell 12% to 2.8Mt due to 12 days of planned and …
Santos (ASX:STO) reported production of 26.3 million barrels of oil equivalent (mmboe) in the September quarter, almost 14% above the June quarter and 23% above the corresponding period. Year-to-date production totalled 71.9 mmboe, nearly 10% higher than the comparative period. Sales volumes reached 26.4 …
Elixir Energy Limited (ASX:EXR) is a Queensland-focused gas explorer and developer with principal activities in the Taroom Trough, a deep gas play in the Surat Basin. Two matters are active for ASX:EXR in October 2026: a second phase of flow testing at the Lorelle-3H …
Please wait processing your request...
You are not subscribed for this report, Want to See?
One of our sales representative will contact you soon!
Welcome to Kalkine!
Start Your 7-Days Free Trial Today!
Hi! How can we help you today?
Loading…