Delta Lithium (ASX:DLI) has released a Scoping Study for its 100%-owned Mt Ida Project in Western Australia, returning a post-tax NPV8 of A$748 million and a post-tax internal rate of return of 33%, according to a corporate presentation filed on 17 November 2026.

Key Points

  • Mt Ida Scoping Study returns post-tax NPV8 of A$748M, post-tax IRR of 33%, and a payback period of 4.3 years
  • Pre-production capital estimated at A$483M including contingency; post-tax free cash flow of A$1,415M over approximately 11-year mine life at 1Mtpa
  • Global JORC Resource at Mt Ida of 14.8Mt at 1.2% Li2O, 170ppm Ta2O5 and 0.42% Rb2O, with all resources on granted mining leases
  • Company held cash of A$48.8M as at 30 September 2026 and shares in ASX-listed companies valued at approximately A$100M as at 10 November 2026

Mt Ida Scoping Study Outcomes

The Mt Ida Scoping Study, dated 17 November 2026, assessed a lithium, rubidium and tantalum operation targeting a production target of approximately 8.5Mt at 1.09% Li2O from the Sister Sam, Timoni and Sparrow deposits. The study envisages production of approximately three saleable concentrates per annum: around 65,000 tonnes of spodumene (SC5.5), around 110,000 tonnes of lepidolite (3.0% Li2O, 1.8% Rb2O), and around 1,700 tonnes of tantalum concentrate (5% Ta2O5). The study was prepared to an accuracy of plus or minus 40% and is a preliminary technical and economic assessment. Measured and Indicated Resources account for 83% of material in the first five years and 73% across the life of mine.

Mt Ida Project Mineral Resource and Permit Status

The Mt Ida Project holds a JORC Mineral Resource Estimate of 14.8Mt at 1.2% Li2O, 170ppm Ta2O5 and 0.42% Rb2O, including Measured and Indicated Resources of 7.7Mt at 1.3% Li2O, 212ppm Ta2O5 and 0.45% Rb2O. According to the filing, all resources sit on granted mining leases, the project is fully permitted for open pit and underground mining, and there is no native title determination over the Mt Ida Project. The resource estimate was disclosed in the company's announcement dated 13 November 2025.

Corporate Structure and Capital Position

As at the date of the presentation, Delta Lithium had 719.8 million shares on issue, 14.4 million performance rights and 2.0 million options outstanding. The company reported a market capitalisation of A$104 million based on a closing price of A$0.145 per share on 10 November 2026, cash of A$48.8 million as at 30 September 2026, and an enterprise value of A$56 million. Major shareholders included Mineral Resources at 22.9%, Idemitsu at 12.0%, Hancock Prospecting at 11.4%, and Waratah at 10.7%. The company also disclosed holdings in ASX-listed companies valued at approximately A$100 million based on 10 November 2026 closing prices.