Key Highlights
- Austral Gold (ASX:AGD) shares were up 7.69% at $0.14 during the 22 October 2026 trading session, as the S&P/ASX 200 fell 0.64%.
- Drilling at Los Nanos returned 95 m at 1.10 g/t AuEq in hole RC-1186, including 3 m at 8.11 g/t AuEq.
- A further programme of up to 8,000 metres is expected to start in Q4 2026.
Austral Gold Limited (ASX:AGD) shares were up 7.69% at $0.14 during the Trading session on 22 October 2026, at 11:55 am. The S&P/ASX 200 stood at 8,774.90, down 0.64% (56.40 points), while the All Ordinaries stood at 8,897.80, down 0.66%, at 11:55 am. Austral Gold is a gold and silver Mining producer with operations in Chile, and its securities are also quoted on the TSX Venture Exchange and the OTCQB market.
About the Company
Austral Gold Limited is listed on the ASX under the code AGD, on the TSX Venture Exchange as AGLD and on the OTCQB as AGLDF. Its registered office is in Sydney, New South Wales. The company describes itself as a growing gold and silver mining producer building a portfolio of Assets in the Americas, based on three strategic pillars: production, exploration and Equity investments.
Business Overview
The Guanaco Mine in the Antofagasta Region of northern Chile is the company's operating asset. The district has been mined intermittently since gold was discovered by artisanal miners in 1878, and Austral recommenced operations there in September 2010.
At Guanaco, the company operates agitation leach and heap leach circuits supported by haul roads, power and water infrastructure. Gold and silver are recovered and sold as doré. Brownfield exploration next to its operating mines is described as a core element of its growth strategy.
First Los Nanos Drilling Results
In a media release dated 28 September 2026, Austral reported the first results from its brownfield programme at Los Nanos, a sector 2.5 km from the Guanaco processing plant. The programme comprised 23 reverse circulation holes (RC-1182 to RC-1204) for 1,128 metres, drilled between Q2 2026 and Q3 2026 on a nominal 25 m by 25 m pattern. Twenty of the 23 holes returned significant results, while RC-1194, RC-1203 and RC-1204 did not.
The longest interval was in RC-1186, at 95 m grading 1.10 g/t gold equivalent (AuEq), made up of 0.97 g/t gold and 11.99 g/t silver. That hole included 3 m at 8.11 g/t AuEq. Other intercepts included 20 m at 3.12 g/t AuEq in RC-1197, 15 m at 3.33 g/t AuEq in RC-1196 and 26 m at 1.82 g/t AuEq in RC-1199.
Resource Context and Geological Model
The announcement of 28 September 2026 stated that the results indicate continuity within the existing Los Nanos Mineral Resource and intersected mineralisation beyond the current resource model. The programme was designed mainly as infill drilling within a predominantly Inferred Mineral Resource.
According to the Guanaco Technical Report, effective 31 May 2026, Los Nanos holds Measured and Indicated resources of 54 kt at 5.14 g/t AuEq for 9 koz of contained gold, and Inferred resources of 378 kt at 1.66 g/t AuEq for 19 koz of contained gold. Los Nanos hosts Mineral Resources but no Mineral Reserves and is not part of the current life-of-mine plan.
Related Sector Context
Gold and silver producers with brownfield exploration programmes typically use drilling to convert Inferred resources into higher-confidence categories and to test for extensions near existing infrastructure.
On the day of the data, the S&P/ASX 200 was down 0.64% and the All Ordinaries down 0.66%, while Austral Gold shares were up 7.69%, so the stock was moving against the direction of both benchmarks at 11:55 am.
Risks to Weigh In
The release itself identifies several uncertainties. Los Nanos holds no Mineral Reserves, and it is outside the current life-of-mine plan, so any contribution to production would depend on further resource conversion and study work. Most of the resource is in the Inferred category, which carries lower geological confidence.
True widths have not been determined, and the company interprets them to be narrower than the intervals reported. Gold equivalent grades depend on stated metal price assumptions of US$2,500/oz gold and US$27.5/oz silver, and no metallurgical recoveries are applied.
Catalysts on Watch
The company expects the next phase of drilling, of up to 8,000 metres in more than 40 holes, to commence in Q4 2026. That phase includes approximately 600 to 800 metres of diamond drilling and is designed mainly to support resource conversion.
Austral also intends to incorporate the new data into an updated three-dimensional geological and structural model, and it is evaluating whether the identified structures host additional mineralisation along strike and at depth. Updated resource estimates, further drilling results and any studies that follow would be the next points of disclosure.
Putting It Together
Austral Gold shares were up 7.69% at $0.14 during the 22 October 2026 session, as both major indices traded lower. The most recent company disclosure covered in this article is the 28 September 2026 report of initial Los Nanos drilling, which returned a 95 m interval at 1.10 g/t AuEq and a further programme of up to 8,000 metres planned from Q4 2026.





_11_12_2026_12_29_36_693411.jpg)
Please wait processing your request...