Key Highlights
- McLaren Minerals (ASX:MML) reported a 529Mt resource at 4.5% heavy mineral at the McLaren Titanium Project.
- The pre-feasibility study states a 15.9-year mine life, pre-production Capital of A$179 million and a 3.7-year payback.
- A bankable feasibility study is underway.
- The company also holds the Barossa project, with zircon and monazite reported.
McLaren Minerals Limited (ASX:MML) released an investor update in November 2026 titled Seeking Scale, describing progress at its McLaren Titanium Project in Western Australia. The presentation covers the project's resource, a completed pre-feasibility study (PFS) and the company's Barossa project. Forward-looking figures in the presentation are company estimates and are subject to the disclaimers it contains.
The McLaren Project
The McLaren project is about 150 kilometres east of Norseman in Western Australia, 42 kilometres west of Balladonia, and 2 kilometres from the Eyre Highway. The company said a sealed road of about 350 kilometres leads to Esperance Port. Mineralisation is shallow, often from surface, in free-flowing sands.
The company reported that the total resource increased from 280Mt at 4.8% heavy mineral (HM) to 529Mt at 4.5% HM, including 249Mt at 4.7% HM in the Indicated category. Ilmenite contained in situ is 7Mt. The total tenement footprint is 521 square kilometres. Drilling this year covered 663 holes for 11,568 metres.
Pre-Feasibility Study Parameters
The base case PFS mines 186Mt at 5.85% HM at a processing rate of 11.8Mtpa, producing an average of about 407 thousand tonnes of ilmenite a year at an operating cost of about A$243 per dry metric tonne of finished product. The company states a mine life of 15.9 years, pre-production capital of A$179 million, average annual EBITDA of about A$56.5 million, life-of-mine net Revenue of A$2.6 billion and a payback of 3.7 years.
The base case mines only part of the resource, and the company said more than 60% remains unmined. A bankable feasibility study (BFS) is underway and may use updated parameters.
The company also reported high-grade lens intercepts including 27 metres at 8% HM from surface in hole MM61, with 6 metres at 24.7% HM from 21 metres, and 13.5 metres at 5.8% HM from surface in MM07. Hole MAC61 returned 14 metres at 5.73% HM from surface. The company said slimes handling and a co-disposal strategy had been validated in metallurgical work.
Barossa and Exploration Targets
The company also holds the Barossa project, where it reports about 16% zircon and the presence of monazite, with intercepts of more than 25% HM. A potential eastern shoreline at McLaren is identified in historical drilling data, and the company said resource growth remains open to the north-east, south and south-west.
Board, Funding and Points to Watch
Simon Finnis is Managing Director and Michael Arnett is Chairman. The company reported cash of A$1.1 million at 30 September 2026 and 505.4 million shares on issue as at 18 November 2026.
The presentation contains forward-looking statements and notes that actual results may differ materially. Development depends on completion of the BFS, approvals, funding and Commodity prices. Items to follow include the updated resource estimate, BFS outcomes and any financing arrangements.
In summary, McLaren Minerals described a larger resource, a completed PFS and a BFS in progress, while noting that its financial parameters are estimates subject to further study and funding.