Key highlights
- FMR Resources (ASX:FMR) logged copper-bearing structures in its first hole at La Martuca.
- The company reported a porphyry unit from 105.75 metres and sulphide-bearing rocks below 115 metres.
- Weather interrupted access, and the company was awaiting laboratory assays.
A 11.11% decline took FMR Resources (ASX:FMR) to AUD 0.400 during the 20 November 2026 session. The benchmark S&P/ASX 200 was also in negative territory during trading. The company, a minerals explorer drilling copper targets in Chile, reported visual observations from the first drill hole at La Martuca on 21 October 2026.
The maiden hole at La Martuca
FMR Resources reported initial geological observations from La Martuca at its La Lorena project in Chile on 21 October 2026. The first drill hole, LLD0001, encountered several structures in which geologists observed copper oxide, chalcocite and chalcopyrite. FMR logged a porphyry unit from 105.75 metres and a broader sulphide-bearing zone below 115 metres. The company reported that the logged structures were consistent with a shallow chargeability feature that helped define the target. These observations describe minerals identified in drill material. The company was awaiting laboratory results to measure copper grades in the sampled intervals.
Weather interrupts the program before planned depth
Unseasonal snow and rain affected access and delayed completion of LLD0001 at 170.1 metres. FMR had planned a hole of roughly 200 metres and expected to resume drilling after safe access was restored, which it estimated would take 10 to 14 days from the announcement. The immediate priority was to finish the first hole before moving to the second. The company designed that second hole to test the upper part of a stronger induced polarisation response and interpreted extensions beneath the first hole. The planned schedule depends on access and what is encountered when drilling resumes.
How the core observations fit the target model
FMR is examining whether the porphyry contact and logged sulphide zone are part of a broader shallow mineralised system. The company noted that spot handheld X-ray fluorescence checks indicated the presence of copper. These checks help identify which element is present at specific sites in the core. The company is relying on laboratory samples to establish concentrations across the relevant intervals. FMR plans to refine its three-dimensional interpretation as it combines drill logs, assays and geophysical observations. That interpretation informs the proposed depth and orientation of later holes at the prospect.
Porphyry exploration in the Chilean setting
At La Martuca, induced polarisation was used to map contrasts in how rocks respond to an electrical charge. The data helped identify areas to investigate with drilling. Logged sulphides in the first hole add a direct geological observation, while the chargeability model covers a larger Volume of rock. A chargeability anomaly can have several geological sources, and a stronger response does not determine copper grade. The company is using the next hole to test whether structures observed in the first hole extend toward the larger response modelled beneath it. FMR identified historical workings at La Martuca and Esperanza, which provide evidence of near-surface mineralisation in those project areas.
Visual estimates, widths and field access
The reported intervals measure distance down the drill hole. The true widths are unknown. Visual estimates refer to observed mineral abundance across logged intervals and do not establish metal concentrations. Core positions and grades from laboratory work will give FMR a basis for comparing the sampled sections. The interruption at 170.1 metres also means the first hole had yet to reach the planned depth at the time of the announcement. Weather and access can affect when the field team completes the remaining drilling and when new geological observations can be made.
Laboratory results and the second target
FMR expected laboratory assays from the first hole in four to six weeks from its October announcement. It planned to complete the hole before testing the stronger chargeability response below it. The second hole can provide a separate set of rock samples and a new position from which to assess the company’s interpretation. Subsequent plans depend on the results of the first two holes and the evolving model. The assay turnaround and the field schedule are distinct, with laboratory measurements needed to establish the significance of the copper observed in the core.
La Martuca at the first-hole stage
The maiden hole provided geological observations across several intervals. Completion of drilling and laboratory analysis are the next steps for determining grades and testing the broader interpretation.

_11_27_2026_12_14_48_273640.jpg)
_11_27_2026_12_14_53_674677.jpg)



Please wait processing your request...