Key highlights
- Australian Gold and Copper (ASX:AGC) reported gold, silver, copper, zinc and lead in a 16-metre downhole interval at Evergreen.
- A two-metre zone within the drilling returned 6.2% copper.
- The company received approvals for a third phase of drilling.
Australian Gold and Copper (ASX:AGC) changed hands at AUD 0.105 on 20 November 2026, up 5.00% at 11:52 a.m. AEDT. The broader S&P/ASX 200 index traded lower during the session. The New South Wales precious and base metals explorer reported new copper, gold and other base metal assays at Evergreen on 12 November 2026.
Evergreen hole intersects multiple mineralised zones
Australian Gold and Copper released drill assays from Evergreen on 12 November 2026. Reverse circulation hole EGRC018 returned six metres at 2.0 grams of gold and 20 grams of silver per tonne with 0.9% copper from 84 metres. A deeper 16-metre interval from 112 metres returned 2.3 grams of gold and 70 grams of silver per tonne, 1.4% copper, 8.0% zinc and 4.1% lead. Within the deeper interval, a six-metre section from 116 metres carried higher gold, silver, zinc and lead grades. Another section from 123 metres returned two metres at 6.2% copper alongside gold and silver.
Other holes return gold and silver assays
Reverse circulation hole EGRC015 returned nine metres at 1.6 grams of gold and 58 grams of silver per tonne from 90 metres. EGRC016 returned six metres at 1.4 grams of gold and 53 grams of silver per tonne from 95 metres. Diamond hole 26DDBR002 returned seven metres at 3.1 grams of gold and 18 grams of silver per tonne from 100 metres. The company grouped its reverse circulation and diamond results in the same update while identifying the drilling method for each hole. The reported interval lengths are measured downhole. The narrower six-metre section returned 18.4% zinc.
A third drilling phase has regulatory approvals
Australian Gold and Copper said regulatory approvals for its third drilling phase had been received. It expected a higher-powered reverse circulation rig to arrive later in the December quarter. The company expects recent Evergreen assays to contribute to an initial Mineral Resource Estimate for the deposit. Evergreen is part of Browns–Evergreen in the South Cobar Basin, around 30 kilometres from the company’s Achilles discovery. The first resource estimate for Evergreen will depend on how the project team incorporates the different drill programs and interprets the distribution of mineralisation across the deposit area.
Polymetallic exploration in the South Cobar Basin
The project contains several metals, and the company reports them separately by sample interval. Gold and silver are reported in grams per tonne, while copper, zinc and lead are expressed as percentages. Metals can occur together or dominate in different parts of a drill hole. At Evergreen, EGRC018 included a zinc- and lead-bearing interval alongside a narrower zone with a higher copper grade. The company can use the grade distribution and geological logs to plan step-out and infill work. Results from the separate Achilles project provide district context and are reported under their own resource estimate.
Widths and resource estimation
Downhole interval length measures the distance along a borehole and depends on how the hole crosses the geology. Further information is required to establish the shape, continuity and true width of any mineralised body. Developing a Mineral Resource Estimate also requires the company to assess how representative the drilling is across the area it seeks to model. The company reported AUD 5.9 million in cash and no Debt at 30 September. The drilling approvals provide one part of the framework for the next campaign, while field progress and assays determine when more geological information becomes available.
Further drilling and the first Evergreen estimate
The next phase is expected to add reverse circulation holes to the drilling completed so far. Results can be assessed together with the recent diamond and reverse circulation data. Australian Gold and Copper expects the current set of results to contribute to its first Evergreen estimate. Further work will determine the positions and extents of the mineralised zones that the estimate can incorporate. The company’s November report identified a later-quarter rig arrival, providing a timetable for mobilisation while the resource work remains contingent on geological modelling and adequate sampling.
What the Evergreen update establishes
The new results identify several metal-bearing zones in recent holes. The approvals allow the next drilling phase to proceed, with an initial resource estimate a separate target.



_11_24_2026_12_13_18_652932.jpg)


Please wait processing your request...