The company received high-grade assay results from a five-hole RC drilling program at the Providence Prospect, located 45 kilometres southeast of Kalgoorlie. Every one of the five holes intersected mineralisation above 0.5g/t Au, and the standout intercepts suggest the gold system at Providence is …
What makes the deferral notable is that it has not slowed activity on the ground. Detailed engineering reached 85% completion during the quarter, and civil and concrete works commenced at site — work that Field said would "enable multiple construction fronts, increased schedule flexibility …
SMIL is a physician-owned and physician-led radiology practice operating 17 outpatient centres across the Phoenix metro area, Scottsdale, Mesa, Gilbert, Peoria, Paradise Valley, and Fountain Hills. The practice will use Ensight alongside its existing Intelerad PACS to standardise medical imaging data and improve the …
The company's intravenous-infused psilocin candidate, TRP-8803, was studied in patients with treatment-resistant Binge Eating Disorder — a neuropsychiatric condition with limited approved pharmacological treatmentOptionsand significant unmet medical need. The results from the Phase 2 study showed 100% of patients achieving clinically meaningful improvement, with …
The headline niobium numbers from the Green deposit continue to exceed the existing Mineral Resource grade, with multiple aircore holes returning thick intervals of high-grade niobium oxide mineralisation. The best intersections include 9m @ 5.6% Nb2O5 from 81 metres within a broader 25m @ …
The company ended Q1 FY27 with $65.1 million in cash and no borrowings, after recording a net operating cash outflow of $10.4 million for the three months to 30 September 2026. That compares with an outflow of $8.3 million in Q4 FY26 and $5.7 …
Recurring revenue accounted for more than 90% of Q1 FY2027 total revenue, a metric that underlines the quality of the company's income base. With 1,144 connected sites at September 2026, EPX's hardware footprint continues to serve as the foundation for its software and services …
The company anticipates a final award may be rendered in the first half of 2027 — an indicative timeline, it cautions, with no specified date for the tribunal to act. Following the completion of the final hearing in 2025 and the filing of post-hearing …
The Edna May acquisition includes the fully permitted 2.9 million tonnes per annum processing facility and associated infrastructure, along with an extensive regional landholding. Executive Chairman David Geraghty described the quarter as "another significant step in Forrestania's transition toward becoming a Western Australian gold …
The total contained rutile in the resource is approximately 2.6 million tonnes, a figure that reflects both the scale of the mineralised system and the consistency of grade across the deposit footprint. The high-grade subset — 159Mt at 0.98% rutile at a 0.8% cut-off …