Highlights

  • Cobalt Blue Holdings updated Halls Creek’s scoping study, proposing a shared processing route for copper, zinc and silver.
  • Initial Capital Expenditure is estimated at AUD 75 million, with additional development and sustaining expenditure required subsequently.
  • Cobalt Blue holds 51% of Halls Creek and elected to earn 75% through additional expenditure by June 2028.
  • Proposed Kwinana cobalt sales remain commercially non-binding, with construction, qualification and definitive agreements required before contemplated deliveries.

Cobalt Blue Holdings Limited (ASX:COB) develops mineral processing technologies and projects, including Halls Creek and the proposed Kwinana cobalt refinery. Shares traded at AUD 0.049, up 2.08%, on 17 November 2026. Its updated Halls Creek scoping study sets out a combined copper, zinc and silver development, while Kwinana negotiations address a separate potential cobalt sales channel.

Halls Creek Combines Two Mining Areas

The 10 November study proposes processing material from the Onedin open pit before progressing to the Sandiego underground operation. A shared heap-leach and processing configuration would produce copper cathode, zinc oxide and silver.

Average annual production is modelled at approximately 4,000 tonnes of copper, 13,000 tonnes of zinc and 130,000 ounces of silver over eleven years. These are study estimates rather than current operating output or assured production guidance.

The production target comprises 91% Indicated and 9% Inferred resources. The inclusion of Inferred material and the preliminary level of engineering mean further technical work is required before a development decision.

Study Returns Depend On Defined Assumptions

On a 100% project basis, the study estimates a pre-tax net present value of AUD 317 million using a 10% discount rate and an internal rate of return of 47%.

Those figures assume copper at USD 13,000 per tonne, zinc at USD 3,100 per tonne and silver at USD 50 per ounce. They describe a particular modelling case, with exposure to changes in prices, operating costs, capital requirements and scheduling.

Initial capital expenditure is estimated at AUD 75 million. Subsequent development capital of AUD 116 million and sustaining capital of AUD 6 million bring total modelled capital expenditure to AUD 197 million.

The scoping estimate carries an accuracy range of approximately plus or minus 35%. It does not establish an Ore Reserve or demonstrate that all necessary finance is available.

Ownership And Further Studies Remain Separate Steps

Cobalt Blue’s current Halls Creek interest is 51%. It has elected to increase that holding to 75% by spending a further AUD 1.5 million on the tenements by 30 June 2028.

The additional interest therefore remains dependent on completing the earn-in requirements. Study expenditure and associated technical work contribute towards the commitment.

A pre-feasibility study is targeted for the first half of 2028. That work is expected to refine the development concept, rather than simply replicate the preliminary financial model.

Kwinana Negotiations Address Product Sales

In October, Cobalt Blue outlined terms with STG Metals for potential cobalt metal purchases from Kwinana. Proposed first-stage refinery capacity is 3,000 tonnes of contained cobalt annually, comprising metal and sulphate products.

The contemplated three-year arrangement provides for 500–750 tonnes of metal in its first year and 800–1,000 tonnes annually in the following two years after commercial operations commence.

Commercial terms are non-binding. Binding provisions concern matters such as negotiations and confidentiality, while construction, product qualification, approvals and definitive contracts remain outstanding requirements. The stated longstop date is December 2028.

With Market Capitalisation of AUD 28.79 million, Cobalt Blue’s immediate milestones concern technical studies, commercial documentation and funding. Neither the scoping valuation nor proposed refinery volumes represent realised earnings.