Key Highlights

  • Cullen Resources (ASX:CUL) reported one-metre resampling assays from its initial air core drilling campaign at Yardilla.
  • The September assays included gold grades of up to 2.42 grams per tonne over one-metre intervals.
  • October fieldwork at North Tuckabianna identified a bedrock conductor for proposed drill testing.
  • The Bromus tenements were sold in July for AUD 350,000 in shares and AUD 100,000 in cash.

Cullen Resources (ASX:CUL) explores gold and base metal projects in Western Australia and participates in joint venture exploration programs. Its September 2026 quarterly report, released on 29 October, provided updates on drilling results at Yardilla, geophysical work at North Tuckabianna, additional exploration opportunities and the disposal of its Bromus tenements.

Yardilla resampling and follow-up drilling

Cullen's Yardilla project comprises exploration licences covering the Cleanthes and Lila gold prospects. The company's interests range from 90% to 100%. Its initial reconnaissance air core drilling program in May involved 25 holes totalling 1,338 metres. Composite samples from the campaign identified shallow gold anomalies adjacent to historical drilling results.

During September, the company reported one-metre resampling assays from the initial program. Reported maximum grades over one-metre intervals included 2.42 grams per tonne of gold, 2,610 parts per million copper and 6.7 grams per tonne silver. A separate reported interval comprised 20 metres grading 0.11 grams per tonne gold from 30 metres. The company identified targets extending approximately two kilometres at both Lila and Cleanthes.

The mineralisation occurs in weathered rocks associated with structures near the Margin of the Yilgarn Craton. At Cleanthes, Cullen plans further drilling along an undrilled geological contact and down dip of existing anomalies. At Lila, follow-up air core or Reverse Circulation Drilling is planned to investigate deeper targets and an untested structural section. Further work is required to determine the geological controls and orientation of the anomalies.

North Tuckabianna and Marymia exploration

At its wholly owned North Tuckabianna copper-gold project, Cullen designed a moving-loop electromagnetic survey during the September quarter to investigate a series of airborne electromagnetic anomalies. Fieldwork undertaken in October identified a bedrock conductor near a contact between felsic and mafic rocks, adjacent to previously identified drilling anomalies. The conductor is intended for drill testing.

The wholly owned Marymia Inlier Gold Project consists of exploration licences E52/4477 and E52/4478, covering approximately 75 square kilometres. Cullen is targeting magnetic features interpreted as greenstone units within granite. The company plans initial mapping and sampling across the project. Its exploration licence application at the Errabiddy Shear Zone covers approximately 250 square kilometres, with reconnaissance mapping proposed.

Joint venture activities and Bromus disposal

Cullen maintains a 25% interest carried to pre-feasibility at the Mt Eureka joint venture, where the operator identified four priority targets using geophysical and surface geochemical datasets. At Killaloe, where Cullen holds a 20% interest carried to a decision to mine, the operator completed a gravity survey across approximately 16 square kilometres. Interpretation and integration with other datasets were underway, with heritage clearances completed after quarter-end.

At its Finland joint venture, two diamond holes totalling 669.2 metres intersected sulphide-bearing veins. The maximum reported copper grade was 0.98% over one metre from 211.4 metres, with no significant gold grades reported. Cullen also completed the sale of two Bromus tenements in July, receiving consideration comprising shares valued at AUD 350,000 and cash of AUD 100,000.

Quarterly cash expenditure

Cullen recorded AUD 89,000 in exploration and evaluation payments, AUD 81,000 in staff costs and AUD 47,000 in administration and corporate expenditure. Net operating outflow totalled AUD 217,000, partly offset by AUD 100,000 of net investing inflows. Cash ended September at AUD 176,000, compared with AUD 293,000 at June-end.

The September Cash Flow report identifies the Bromus cash proceeds separately from expenditure on exploration. The share component of the disposal consideration was not a cash receipt. Cullen retains interests in several projects operated by joint venture partners.

The company's reported priorities include deeper drilling at Yardilla, testing the North Tuckabianna conductor and initial fieldwork at Marymia and Errabiddy, alongside exploration undertaken through its joint ventures.