Key Highlights

• Maiden Inferred Mineral Resource of 14.8 Mt at 1.0% Li2O at the Bolt Cutter Central project

• Total lithium resources grow approximately 20% to 88.3 Mt at 1.0% Li2O across Tabba Tabba and Bolt Cutter Central

• Initial metallurgical testwork achieved spodumene recoveries of 82.5% for a product grade of 5.66% Li2O

• Bolt Cutter Central is located just 10 km from the Tabba Tabba Lithium Project with outcropping mineralisation

Wildcat Resources Limited (ASX:WC8) announced on 23 November 2026 a maiden Mineral Resource at its Bolt Cutter Central project in the Pilbara region of Western Australia, located 10 km west of its Tabba Tabba Project.

Maiden Resource and Portfolio Growth

The Inferred Mineral Resource of 14.8 Mt at 1.0% Li2O comes from the shallow-dipping Harry and Hermione pegmatites. Lithium mineralisation occurs from surface, with the main Harry pegmatite thickest near surface providing shallow access. Combined with the existing 73.5 Mt at 1.0% Li2O at Tabba Tabba, total lithium resources grow approximately 20% to 88.3 Mt at 1.0% Li2O.

At a lower 0.6% Li2O cut-off, Bolt Cutter Central increases to 20.4 Mt at 0.9% Li2O, with total project resources rising to 110.9 Mt at 0.9% Li2O. The mineralised pegmatite system remains open along strike and down dip.

Metallurgical Results and Development Context

Initial metallurgical testwork using the Tabba Tabba workflow achieved spodumene recoveries of 82.5% for a product grade of 5.66% Li2O. The Tabba Tabba DFS, released in October 2026, outlines a staged development based on a Probable Ore Reserve of 48.3 Mt at 0.97% Li2O with ore processing capacity of up to 4.5 Mtpa.

Bolt Cutter Central's resources are not included in the DFS production or financial forecasts and represent growth optionality. The company remains well funded with $76.1 million in cash as at 30 September 2026. Any potential contribution will require further resource, mining, metallurgical and economic studies.