Key Highlights
- Stavely Minerals Limited (ASX:SVY) has published the full Scoping Study report for its Thursday's Gossan deposit at the 100%-owned Stavely Copper-Gold Project in western Victoria, and outlined alternative development pathways it is now studying.
- The study, first announced on 10 August 2026, models a three-stage, 4Mtpa open pit operation with a pre-tax NPV7 of A$818 million and an IRR of 40%.
- Average annual free Cash Flow of about A$110 million from first production and net Operating Cash Flow of A$1.4 billion.
- Capital costs of A$333 million for the process plant and site infrastructure, including a 30% contingency, plus A$139 million of pre-production stripping.
Stavely Minerals Limited (ASX:SVY) has published the full Scoping Study report for its Thursday's Gossan deposit at the 100%-owned Stavely Copper-Gold Project in western Victoria, and outlined alternative development pathways it is now studying.
The study, first announced on 10 August 2026, models a three-stage, 4Mtpa open pit operation with a pre-tax NPV7 of A$818 million and an IRR of 40%. The company also said it is in preliminary talks with several parties about a possible strategic development partner, which may attract attention from investors following copper developers.
What did Stavely announce?
The final Scoping Study is now available on the Technical Reports page of the company's website. Key outcomes for the large-scale open pit case include:
Pre-tax NPV7 of A$818 million and IRR of 40%.
Payback of 2.5 years of production.
Average annual free cash flow of about A$110 million from first production and net operating cash flow of A$1.4 billion.
Life-of-mine AISC of US$3.76/lb copper, and US$2.75/lb over the first three years.
An assumed copper price of US$5.54/lb, which the company said copper is currently marginally above despite recent metals price falls.
Capital costs of A$333 million for the process plant and site infrastructure, including a 30% contingency, plus A$139 million of pre-production stripping.
The company is also studying three alternatives: a small-footprint underground mine focused on the high-grade Cayley Lode (9.1Mt at 1.6% CuEq, comprising 1.2% Cu, 0.27 g/t Au and 8.4 g/t Ag); a hybrid open pit transitioning to underground; and heap leaching of the chalcocite-enriched blanket (22Mt at 0.39% Cu).
The total Mineral Resource, dated 17 March 2026, is 59Mt at 0.53% CuEq (0.43% Cu, 0.08 g/t Au, 2.7 g/t Ag), containing about 250kt of copper, 154koz of gold and 5.2Moz of silver.
Executive Chair and Managing Director Chris Cairns said there was no need to lock in the large-scale open pit as the only option, as a new partner or owner may view the opportunity differently.
Related Sector Context
Mineral exploration and Mining involve successive stages of geological assessment, resource definition, feasibility work and development. Commodity demand, grade, recovery, infrastructure and access to Capital shape the Economics of projects. Exploration results alone do not establish a commercially viable operation.
Risks to Watch Out
The company also acknowledged that bringing in a partner may dilute its project-level interest, while arguing that a smaller share of a fundable project could still create material value. Talks are preliminary and there is no certainty of any commercial arrangement.
Project economics may change as further geological information becomes available and as assumptions for recovery, operating expenditure and capital requirements are refined. Commodity prices and access to funding can influence development decisions. Delays in technical studies, approvals or contractor availability could increase expenditure before a project generates revenue.
Geological continuity and resource classification may change with further drilling. Development schedules are also exposed to permitting, contractor availability and cost escalation. Additional Equity or Debt funding could be required before production, and potential Revenue remains sensitive to commodity prices and realised recoveries.
What should investors watch next?
Results of the underground, hybrid and heap leach studies.
Any progress in partner discussions, noting the company says no arrangement is certain.
Renewed exploration activity, as Stavely says it intends to refocus on discovery.
Copper price movements relative to the study's US$5.54/lb assumption.





_11_25_2026_07_07_20_632446.jpg)