Key Highlights

  • Expanded LiDAR review of EPM 28652 generated five new targets at historic workings, defined without ground work.
  • Kentucky and Harrington are the two priority targets, both located near sealed roads and tracks.
  • The company reported no drilling results, and the historic sample results are selective and not independently verified.
  • The tenement is still registered to the previous owner, with transfer pending, and conduct agreements are needed before drilling.

Clara Resources Australia Limited (ASX:C7A) announced on 18 November 2026 five new targets generated by its expanded high resolution LiDAR survey on EPM 28652 at the Mareeba Gold Project in the Hodgkinson Basin of Far North Queensland. The targets were identified from a terrain model and historic records, ahead of any field mapping, sampling or ground disturbance.

The company described the Hodgkinson goldfield as having produced about 300,000 ounces of gold from multiple deposits, and EPM 28652 extends its ground along the southern extension of the Kingsborough Fault corridor.

The Five Targets

The five targets are Kentucky, Harrington, Lost Reef, Granola and Kimalo North, each centred on historic workings resolved beneath tree cover. Kentucky and Harrington were prioritised because of the scale of the workings and their access from sealed roads.

At Kentucky, the Geological Survey of Queensland records a historic gold mine with no production records available. A selected ore pile sample assayed 4.4 g/t Au. At Harrington, Homestake dump samples returned up to 2.14 g/t Au, and the company described a shaft line of about nine shafts over 85 m.

Survey Method and Data Limitations

The expanded LiDAR survey was flown between 9 and 13 August 2026 at 20 points per square metre, and the company gridded the classified ground points to a 0.25 m bare earth terrain model. The company said the interpreted features have not yet been verified in the field.

The historic sample results are selective, and the company said they may not represent mineralisation in place. The historic results were not independently verified by Clara, and the company said there is no certainty that drilling would intersect mineralisation at the conceptual drill targets.

Tenure and Access

At the time of reporting, EPM 28652 remained registered in the name of the previous owner, and transfer of legal title was pending registration with the Queensland Department of Resources. The company said the tenement is in good standing, subject to native title interests and pastoral leases.

Conduct and compensation agreements with relevant landholders will be required before drilling. Kentucky is about 13 km north of Dimbulah and Harrington about 10 km north of Mutchilba, and the company said the sealed Braund Road crosses the permit between the two targets.

Final Word

Clara’s LiDAR work has identified five historic workings on EPM 28652 that the company intends to assess further, with Kentucky and Harrington considered the most immediate drilling candidates. The findings are based on Remote Sensing and historic records rather than new samples.

Field inspection, rock chip sampling and tenure registration remain outstanding. The company said it will assess whether the two priority targets can be included in its existing drilling program at Mareeba.