Highlights

  • Mount Hope Mining (ASX:MHM) announced the commencement of Phase 4 diamond drilling at its Mt Solitary gold prospect on 23 November 2026.
  • The preceding Phase 3 campaign intersected 6 metres at 6.8 grams per tonne gold from 268 metres in hole 26MSRC031.
  • Gold mineralisation was intersected approximately 280 metres below surface on two separate drill sections about 120 metres apart.
  • The company aims to use deeper drilling and structural information to support geological modelling and a potential maiden mineral resource estimate.

Mount Hope Mining (ASX:MHM) explores gold and polymetallic targets within its Mount Hope Project in the Cobar Basin of New South Wales. On 23 November 2026, the company announced that Phase 4 diamond drilling had commenced at Mt Solitary. The programme follows November reverse-circulation results and is intended to examine mineralisation beyond the depth reached by earlier drilling.

Phase 4 Drilling Follows November Gold Intersections

Mount Hope announced the start of its Phase 4 diamond drilling campaign on 23 November, following the release of Phase 3 reverse-circulation results on 10 November. Hole 26MSRC031 returned 6 metres at 6.8 grams per tonne gold from 268 metres, including 4 metres at 9.9 grams per tonne from 270 metres. The same hole also intersected 15 metres at 2.4 grams per tonne from 242 metres, including a higher-grade interval. These intersections are not ore reserves.

Deeper Intercepts Inform the Geological Model

The Phase 3 release also recorded 17 metres at 2.4 grams per tonne gold from 264 metres in hole 26MSRC033, including 6 metres at 5.4 grams per tonne. Another hole, 26MSRC029, returned 26 metres at 1.5 grams per tonne from 169 metres. The company reported significant gold about 280 metres below surface on two sections separated by approximately 120 metres. It interpreted the results as evidence that mineralisation continued down dip and remained open at depth and towards the northeast. Further drilling is required to establish the continuity, orientation and scale of these zones; the earlier intersections alone cannot establish economic extraction.

Mt Solitary Exploration Target and Resource Work

Mt Solitary forms part of Mount Hope’s 100%-owned exploration holding in the southern Cobar Basin. The company has disclosed a JORC 2012 Exploration Target of 1.32 million to 1.87 million tonnes grading 1.0 to 1.35 grams per tonne gold, equivalent to approximately 42,500 to 81,400 ounces. That range is conceptual: insufficient exploration has been completed to estimate a Mineral Resource, and it is uncertain whether further work will result in one. The purpose of additional drilling is therefore not merely to find isolated high-grade intervals, but to test how individual intersections relate spatially and whether a defensible resource model can be developed.

Technical Uncertainties and Upcoming Exploration Work

Diamond core can provide geological and structural observations that are difficult to obtain from reverse-circulation samples alone. Such information may help Mount Hope refine the orientation of mineralised structures and plan subsequent drilling. However, interpretation remains dependent on core logging, laboratory assays and the consistency of results between holes. Subsequent assays will inform the geological model. A maiden mineral resource estimate remains an objective rather than an accomplished milestone.

Key Insights

Phase 4 represents a change in drilling method after Phase 3 identified gold at greater depths. The November results provide specific targets for further investigation, but geological continuity, resource classification and development potential remain unproven. The Exploration Target is not a resource.