Highlights

  • Marmota (ASX:MEU) has restarted drilling at the Campfire Bore gold prospect in South Australia.
  • The maiden program returned a one-metre result of 107g/t gold from 57m in January 2025.
  • Campfire Bore is part of the Golden Moon joint venture, in which Marmota holds 90%.
  • Greenewood and Mainwood drilling was lifted to about 26,000 metres across 289 holes.
  • A maiden scoping study for the Gawler Gold Project began in November 2025.

Marmota Limited (ASX:MEU) is an Adelaide-based explorer with a portfolio of gold deposits in the Gawler Craton of South Australia, which it groups as the Gawler Gold Project. Stockhead reported that the company has started a new round of drilling at Campfire Bore, a prospect that produced some of its highest grades in 2025. The planned metres and timing of assays were not confirmed in the material reviewed, so the ASX release is the reference for those details.

A Prospect With High Grades

Campfire Bore lies in the Gawler Craton near Coober Pedy, about 30km west of Marmota's Aurora Tank gold discovery. Before Marmota arrived, the ground had not been explored since 2018. Early results from the company's first program included 4 metres at 16 grams per tonne gold from 56 metres and 16 metres at 2.7g/t from 35 metres. The headline result was a one-metre split of 107g/t gold from 57 metres in January 2025. Marmota (ASX:MEU) also reported mineralisation traced over more than 1.5km of strike.

Joint Venture Structure

Campfire Bore forms part of the Golden Moon joint venture. Marmota holds 90% through its Subsidiary Half Moon, and Coombedown Resources holds the remaining 10%. The same venture includes the Greenewood and Mainwood deposits. The structure matters because it determines how costs and any future production are shared, and Marmota (ASX:MEU) describes the Gawler Gold Project as an arc of deposits that it holds at either 100% or 90%.

Why Campfire Bore Went Quiet

During 2025 and 2026 the company concentrated its drilling on Greenewood, about 35km north-west of Aurora Tank, where strike length has extended beyond 2km. The Stage 3 program at Greenewood and Mainwood was lifted to about 26,000 metres across 289 planned holes. The aim is to tighten drill spacing so that an Indicated resource can be estimated, which is a prerequisite for the Gawler Gold scoping study that began in November 2025. Marmota (ASX:MEU) has indicated that more than 50,000 metres of RC drilling would be completed at Greenewood over 13 months.

What to Watch

The key items are the new Campfire Bore drilling results, any updated mineral resource estimates and the timing of the Gawler Gold scoping study. The scoping study will assess how the arc of deposits, including Aurora Tank, Golf Bore, Campfire Bore, Greenewood and Mainwood, could fit together. Drilling results do not by themselves establish an economic project, and the study remains an early-stage assessment. Marmota (ASX:MEU) will also need to manage funding for its large drilling programs.

Key Insights

Marmota (ASX:MEU) is returning to a prospect that delivered some of its highest historical grades, while its larger effort at Greenewood supports resource growth and a first scoping study. The new Campfire Bore results will show whether the earlier high-grade intercepts can be repeated and extended within the broader Gawler Gold Project.