Highlights

  • Elk Range Mining shares rose 11.11% to AUD 0.150 on 16 November, with 209,382 shares traded during the session.
  • Elk Range’s maiden Friday drill hole returned 290 metres at 2.8 grams per tonne of gold in the October assays.
  • The headline intercept included 89.6 metres at 5.5 grams per tonne of gold, with intervals reported on a downhole basis.
  • The explorer started a surface diamond programme of approximately 2,850 metres at the former Idaho mine after its ASX listing.

Elk Range Mining Limited (ASX:ELK) finished the 16 November 2026 session at AUD 0.150, up 11.11%. The stock traded between AUD 0.138 and AUD 0.150. The company’s first quarter as a listed explorer provided an initial assay benchmark for the historical Friday mine in Idaho. Its Market Capitalisation was AUD 12.36 mn.

A Long Intercept in the First Hole

Elk Range’s first hole returned 290 metres at 2.8 grams per tonne of gold, including 89.6 metres at 5.5 grams per tonne. The hole followed the interpreted shear zone. As a result, the reported intervals are measured along the hole and the true width remains unestimated.

Geologists recovered oriented core and logged native gold in several intervals. One set of seven observations occupied approximately 10 centimetres of core. Later assays put the sampled interval from 122.38 to 122.68 metres at 268.4 grams per tonne. The smaller sample interval and the broader reported assay capture different parts of the hole.

Historical Drilling Provides a Comparison

The team drilled alongside historical hole PFR2014_06, which ended at 137.16 metres. The new hole passed that depth, and the company logged additional visible gold below the old hole’s endpoint. Comparing the two holes gives the company a way to assess the continuity and structural setting of the earlier results.

The Assay Result for the new hole and the company’s plans for the historical counterpart address different questions. The first measures selected lengths in the new core, while the historical comparison helps the team determine how to position subsequent holes.

The Programme Has Three Exploration Aims

Elk Range designed its programme to validate historical drilling, gather information for a future JORC resource estimate, and test the system at depth and along strike. The initial plan contemplated up to eight surface diamond holes, with scope for two additional holes.