Highlights

  • Diamond drilling began at Spodumene Hill on 20 November 2026.
  • The program totals about 3,000 metres, split roughly evenly between Spodumene Hill and regional targets.
  • An auger program is running at Tindara South and Tindara East.
  • No grades, Mineral Resource or Exploration Target have been reported for Atex.

Australasian Metals Limited (ASX:A8G) is an exploration company focused on lithium and tantalum in Côte d’Ivoire, West Africa. It holds an exclusive option to acquire a 75% interest in the Atex Lithium-Tantalum Project, which includes the Spodumene Hill pegmatite swarm. On 20 November 2026 the company reported that diamond drilling had started at Spodumene Hill, moving the project from preparation into its first drill test under the company's program.

Diamond Drilling Gets Under Way

Australasian Metals (ASX:A8G) said the diamond program is planned at about 3,000 metres. Roughly 1,500 metres will target the known spodumene-bearing pegmatites at Spodumene Hill, to assess the extent and continuity of lithium mineralisation. The remaining 1,500 metres or so will test regional prospects along an interpreted north and north-northeast structural corridor, both north and south of Spodumene Hill.

Drilling is being carried out by Easy Drill Sarl, with company geologists on site working alongside local contractors. Targets were finalised with the local team, and drill pads were prepared before the rig mobilised. Managing director Dr Qingtao Zeng said the program had come together efficiently and that the company looked forward to keeping shareholders updated.

Auger Work at Tindara South and East

The diamond program follows preparatory work reported in mid-November 2026. Australasian Metals (ASX:A8G) said an auger program had begun at two priority areas, Tindara South and Tindara East. Traverses are about 400 metres apart, with holes about 10 metres apart along each line, tightening to about 5 metres where lithium anomalism or pegmatitic material is found.

The top 2 metres of each auger hole is composited to look for tantalum and niobium-bearing heavy minerals, while material from the bottom of each hole is logged and selected samples are sent for assay. SEMS Geological Services is handling logging, supervision and quality control, and a refurbished camp can house up to 15 people.

Geological Setting

The company has described the mafic volcanic belt hosting the Spodumene Hill pegmatite swarm as running north-northeast for more than 20 kilometres, with a width of about 4 to 6 kilometres. It has also reported outcropping spodumene and lepidolite-bearing pegmatite about 13 kilometres along trend to the north.

Spodumene is the lithium-bearing mineral most commonly mined from hard-rock pegmatites, so visible spodumene at surface is a reason to drill but is not evidence of an economic deposit. Thickness, grade and continuity at depth are what the core is intended to show. Australasian Metals (ASX:A8G) is also reviewing historical soil geochemistry from the eastern part of licence PR777 and is considering further laser-induced breakdown spectroscopy work.

What Has Not Been Disclosed

The company's announcements to date do not give a hole count, hole depths, collar locations or an assay timetable. No drill intercepts, grades, Mineral Resource or Exploration Target have been reported for Atex, and the announcements do not set out how the program is funded. Until the 75% interest is acquired, Australasian Metals (ASX:A8G) holds only an option, so its ultimate exposure to any discovery depends on the option terms. The company has said it will report progress as drilling advances.

Key Insights

Australasian Metals (ASX:A8G) has started its 3,000-metre diamond program at Spodumene Hill, with auger work continuing at Tindara South and Tindara East. The project is at an early exploration stage under an option to acquire 75%, and no grades or resources have been reported.