Liontown Limited (ASX:LTR) reported 77,982 dry metric tonnes of spodumene concentrate production in the September 2026 quarter. Sales totalled 82,561 dry metric tonnes across five parcels, with an average grade of 5.2% lithium oxide. Production and sales should be distinguished because inventory and shipment …
For the three months ended 30 September 2026, PLS Group Limited (ASX:PLS) produced 267.6 thousand tonnes (kt) of spodumene concentrate, an increase of 25% from the June quarter. Output reflected Pilgan performance and the Ngungaju restart. The company sold 223.6kt during the quarter, noting …
• Higher-grade zones within the broad intervals include multiple intersections above 0.40% copper, highlighting the potential for stronger grade concentrations within the broader porphyry system.
The first drill hole, AQRC0001, was collared on 6 November 2026, marking the opening of a program designed to test extensions to significant historical gold intersections and to assess the broader discovery potential along the 26.5km Aquarius Gold Trend. The program will initially focus …
The initial phase of drilling is planned to consist of 12 holes for an estimated 2,650 metres of combined diamond and reverse circulation (RC) drilling. The program's first priority is to confirm CR3's revised interpretation of high-grade mineralisation identified in historical drilling, followed by …
The two drillholes for which preliminary assays have been received — 26KSTRC003 and 26KSTRC004 — both intersected silver mineralisation at multiple depths, consistent with the company's pre-drill geological model of repeated sub-horizontal lode structures beneath the historic Keystone Mine workings. The results indicate the …
The aircore drilling program at Mt Monger has been initiated following the completion of heritage surveys at the site and the conclusion of a previous drilling campaign at the Avoca Gold Project within the company's broader Coolgardie Gold Projects. The program focuses on two …
The proposed share issue is to be made using 480,000 shares from the company's existing 15%Placementcapacity under ASX Listing Rule 7.1. No separateShareholderapproval is being sought for this issuance. The shares are expected to be issued on 15 December 2026 and will rank equally …
The appointment of K-Drill marks a critical step in Valiant's development timeline at the Comet Gold Mine. The drilling program has been designed to address three priorities: near-term grade control at the Pinnacles trend to support detailed mine planning, resource conversion to improve confidence …
The first completed hole, 26JHD001, was drilled as a 100-metre step-out to the north of historical drilling and was terminated in mineralisation at 275.5 metres due to drilling difficulties. Assay results have been received for the upper 126 metres of the hole, confirming broad …