AuKing's first RC drilling at East Tundulu returned 67 metres at 1.68% total rare earth oxides from surface, including 12 metres at 2.56% TREO. The company says the area had not been drill tested before and extends the known mineralised footprint beyond its primary …
Broad surface intervals from trench PO-16a returned 126.3 metres at 0.41 g/t AuEq, and PO-10b recorded the highest average grade in the program at 30.4 metres at 0.64 g/t AuEq. Copper-in-soil anomalism now extends south of the resource pit shell, and new reconnaissance trenching …
Drillforce, the wholly owned Aquirian subsidiary, has been named preferred supplier for drill and blast services at the Mid-west Hub of SMSMiningServices. The initial 24-month scope is valued at approximately A$32 million, with works expected from the January quarter 2027, subject to final negotiation.
The flagship Forrest deposit drives the bulk of the MRE, contributing 2.69 million tonnes at 1.7 g/t Au for 147,000 ounces. Mineralisation at Forrest remains open along strike and at depth, meaning the current resource boundary does not represent the full extent of what …
The project now consists of two granted Exploration Licences — E28/3555 and E28/3556 — covering approximately 158 blocks and 470 square kilometres approximately 200 kilometres east of Kalgoorlie. Access is via the Trans Access Road, a sealed route that reduces logistical complexity for fieldwork …
The deal, described by PLS Managing Director and CEO Dale Henderson as making PLS Fortescue's first external Green Grid customer, is expected to reduce unit operating costs on a free-on-board basis by approximately $15 to $20 per tonne compared to the recently announced 10-year …
DDH-3 returned four individual brine samples exceeding 900mg/L Li and eight samples exceeding 800mg/L Li. The key high-grade intervals included 995mg/L Li from 444.2m to 445.0m, 964mg/L from 461.2m to 462.0m, 943mg/L from 480.2m to 481.0m, and 922mg/L from 454.2m to 455.0m. Additional significant …
At an assumed gold price of A$5,714 per ounce, the study returns a post-tax net present value of $86 million at an 8% discount rate and an internal rate of return of 45%. These metrics reflect a project with a low upfront capital requirement …
For a company of SER's size, the pace of activity has been notable. This campaign follows the recent completion of diamond drilling at the Canobie Copper Project and the Bulimba Gold Project, creating a pipeline of pending assay results across three separate projects in …
The updated PFS also reported a post-tax Internal Rate of Return of 39.1% and a payback period of 2.8 years from first production. Those metrics — particularly the payback period — reflect a project with attractive near-term cash generation characteristics relative to itsCapitaloutlay, which …