The laboratory analysed two samples from Ramsay 1 and four from Ramsay 2. Of the Ramsay 2 samples, two came from the Kulpara Dolomite and two from the Hiltaba Basement, giving the company readings from more than one geological unit.
The company linked the timing to recent political changes in Venezuela, which it said have opened avenues for qualified foreign entities to participate in the country's oil sector. Forte has not named any specific projects, basins or resources, so the agreement is best understood …
Each two new shares come with one free attaching option exercisable at 2.5 cents and expiring on 31 December 2028. ADX said it will seekQuotationof the options. Because the offer is renounceable, shareholders who do not want to take up their entitlements can sell …
The newly refurbished V10 rig is being moved into position under the management of Vercana, Vulcan’s in-house drilling company. It is intended to operate alongside existing Lionheart field activity, allowing multiple well sites to be advanced in parallel. Vulcan Energy Resources Limited (ASX:VUL) has …
The 11 November transaction concerns approximately 173,000 pounds of uranium product that had been classified as off-specification. Lotus Resources Limited (ASX:LOT) had previously discussed this inventory while working through early commissioning issues. The sale provides a proposed commercial route for material that otherwise could …
Woodside Energy Group (ASX:WDS) reported production of 46.2 million barrels of oil equivalent (MMboe) for Q3 2026, up 12% from 41.3 MMboe in Q2. The company attributed the sequential recovery in part to higher output from Pluto LNG after planned turnaround activities in the …
Viva Energy Group (ASX:VEA) reported a Geelong refining margin of USD 21.1 per barrel for the first half of 2026, compared with a lower margin environment in the corresponding prior period. Refining margin measures the difference between the value of refined products and the …
Lotus Resources Limited (ASX:LOT) owns 85% of the Kayelekera uranium operation, while the Government of Malawi holds the remaining 15%. The mine resumed production after its restart programme, and the company is working towards a stated steady-state output of 2.4 million pounds of uranium …
During the clean-up flow test of Annie-2, a peak surface-constrained flow rate of 58.8 million standard cubic feet per day (MMscf/day) was achieved through a 60/64-inch choke. The main flow period of approximately 8 hours and 20 minutes recorded an average stabilised rate of …
Oxford University has measured Helium-3 concentrations in all six gas samples analysed from the Ramsay 1 and Ramsay 2 flow tests. After correction for Argon introduced as a purge gas during start-up, concentrations range from 504 ppt at Ramsay 1 to 1,220 ppt at …