NuEnergy holds 45% of the Tanjung Enim PSC, which is operated by Dart Energy (Tanjung Enim) Pte Ltd. The company's first plan of development (POD 1) covers 33 km² of the 249.1 km² contract area and targets 25 MMSCFD in total, comprising 1 MMSCFD …
Canyon-3 reached a total depth of 3,792.6 metres on 15 August. Omega reports a 526-metre gross hydrocarbon-bearing interval and 170 metres of aggregate net pay across six stacked reservoirs, which it says exceeded pre-drill expectations. The Canyon Sandstone contained 18 metres of net oil-bearing …
Maiden diamond drilling at Gillham, which Pantera owns outright, began on 18 August and finished on 16 October 2026. The programme comprised nine HQ-diameter holes totalling 906 metres. The company describes it as the first known modern subsurface test of the historic district, with …
The long-form agreement was signed on 20 July 2026. REZ said Rembrandt will fund 100 per cent of capital and run mining as contract operator, while REZ keeps full ownership of the tenements and remains the legal operator. Profits are split 50/50 at a …
Average daily production was 73,326 standard cubic metres (gross), compared with 77,127 in the June quarter. Gross quarterly output was 6.75 million cubic metres, of which Po Valley's 63% share was 4.25 million. In late September the flow rate was reduced to roughly 60,000 …
The business states it has collected 82% of 1,186 planned soil samples, including work after quarter end, with the remainder due in late October and November 2026. Samples were taken along ridges at 100-metre spacing over historical prospects and 200-metre spacing elsewhere. About 17% …
GE Vernova (NYSE:GEV) reported third-quarter 2026 results that reaffirmed the company's position at the centre of one of the most consequential capital investment cycles in the global energy industry. Revenue of $12.6 billion for the quarter ended 30 September 2026, up 27% year over …
EWC has received US$60 million directly from Hallador to date: US$10 million received in September 2026 appears in the quarterly cash flows, and a further US$50 million delivery payment occurred after the quarter ended on 22 October 2026. Hallador has, according to EWC, confirmed …
Comet Ridge became sole owner of the 1,847-square-kilometre Mahalo Gas Hub after completing the purchase of Santos’s 42.86% interest on 21 August 2026. The company plans a staged development rather than a single expansion to full capacity.
Ensign Rig 974 spudded PV15 at 11:30am ACST. The well targets the Pacoota Formation on Palm Valley’s southern flank through a deviated path at approximately 78 degrees.