Wildcat Resources Limited (ASX:WC8) has announced a maiden Inferred Mineral Resource of 14.8Mt at 1.0% Li₂O at its Bolt Cutter Central project in Western Australia's Pilbara region, located 10km west of the company's Tabba Tabba Lithium Project, bringing total combined lithium resources to 88.3Mt at 1.0% Li₂O.
Key Points
- Maiden Inferred Mineral Resource of 14.8Mt at 1.0% Li₂O reported at a 0.7% Li₂O cut-off grade from the Harry and Hermione pegmatites at Bolt Cutter Central
- Resource represents approximately a 20% increase to Wildcat's total lithium resource base, adding to the existing 73.5Mt at 1.0% Li₂O at Tabba Tabba
- Initial metallurgical testwork using the Tabba Tabba workflow recorded spodumene recoveries of 82.5% for a product grade of 5.66% Li₂O
- At a 0.6% Li₂O cut-off grade, Bolt Cutter Central resource increases to 20.4Mt at 0.9% Li₂O, with total project resources rising to 110.9Mt at 0.9% Li₂O
- Wildcat disclosed cash of $76.1 million as at 30 September 2026
Bolt Cutter Central Mineral Resource Details
The JORC (2012) Mineral Resource at Bolt Cutter Central is classified entirely as Inferred, totalling 14.8Mt at 1.0% Li₂O, containing 147,900 tonnes of Li₂O and 1,178,300 pounds of Ta₂O₅, with a Ta₂O₅ grade of 36 parts per million and Fe₂O₃ of 0.94%, reported above a 0.7% Li₂O cut-off grade. Lithium mineralisation occurs from surface, and in the main Harry pegmatite, mineralisation is thickest near surface. The mineralised pegmatite system remains open along strike and down dip, with additional targets identified between known mineralised zones. Studies have commenced to evaluate development as part of the broader Tabba Tabba Lithium Project.
Metallurgical Testwork and Project Characteristics
Initial metallurgical testwork using the Tabba Tabba metallurgical workflow recorded spodumene recoveries of 82.5% for a product grade of 5.66% Li₂O. The host pegmatites are exposed at surface with shallow-dipping geometry, providing a basis for assessing open-pit mining options subject to geotechnical investigations and mine-design studies. The project's proximity to Tabba Tabba creates opportunities to assess shared processing, accommodation, logistics and support services as part of Wildcat's disclosed hub-and-spoke strategy, subject to capacity, compatibility and approvals. The Inferred Mineral Resources at Bolt Cutter Central are not included in the Tabba Tabba Definitive Feasibility Study production or financial forecasts.
Total Resource Base and Lower Cut-Off Grade Scenarios
With the addition of Bolt Cutter Central, Wildcat's total lithium resources are disclosed at 88.3Mt at 1.0% Li₂O across Tabba Tabba and Bolt Cutter Central. At a lower cut-off grade of 0.6% Li₂O, Bolt Cutter Central alone increases to 20.4Mt at 0.9% Li₂O, and total project resources across both projects increase to 110.9Mt at 0.9% Li₂O. The company disclosed cash of $76.1 million as at 30 September 2026. Any potential contribution from Bolt Cutter Central will be evaluated through further resource, mining, metallurgical, infrastructure and economic studies, together with required approvals for any eventual future development.



Please wait processing your request...