Vulcan Energy Resources (ASX:VUL) has been granted the Landau-Ost geothermal and lithium exploration licence, located directly adjacent to its Lionheart lithium and renewable energy project currently under construction in the German state of Rhineland-Palatinate, the company disclosed on 19 November 2026.

Key Points

  • The Landau-Ost geothermal and lithium exploration licence has been granted for a period of five years, directly adjacent to the Lionheart Project in Rhineland-Palatinate, Germany.
  • Analysis of available subsurface data for Landau-Ost has commenced, with a maiden lithium resource estimate targeted for Q1 2027.
  • A feasibility study to assess development options, including a potential tieback development to the Lionheart Project, is planned to follow the resource estimate.
  • The Lionheart Project targets first production in H2 2028 and has take-or-pay lithium offtake contracts in place.

Landau-Ost Licence Grant and Location

The Landau-Ost licence has been granted adjacent to Vulcan's Lionheart Project, which the company describes as its first phase of production. The licence is designated as a geothermal and lithium exploration licence and has been granted for a five-year period. According to the filing, available subsurface information indicates geological characteristics consistent with the adjacent Lionheart Project. The filing states the licence strengthens Vulcan's position around Lionheart and adds to the company's land holding in what it describes as Europe's most important lithium province.

Lionheart Project Construction and Production Targets

The Lionheart Project is currently under construction and targets a production capacity of 24,000 tonnes of lithium hydroxide monohydrate per annum, described as sufficient for approximately 500,000 electric vehicle batteries per annum. Co-products include 275 GWh of renewable power and 560 GWh of heat per annum for local consumers, over an estimated 30-year project life. The project holds take-or-pay lithium offtake contracts and targets first production in the second half of 2028, according to the filing.

Next Steps for Landau-Ost Resource Assessment

Vulcan has commenced analysis of available subsurface data for Landau-Ost to support the determination of a maiden lithium resource estimate, which the company has targeted for Q1 2027. Following the resource estimate, a feasibility study is planned to determine how best to maximise value from the licence. The filing states that development options to be assessed include the potential for a tieback development to the Lionheart Project, given Landau-Ost's proximity to existing production infrastructure. The company said the licence reflects its strategy of concentrating its portfolio on its highest-value development opportunities.