Tasmea Limited (ASX:TEA) has executed a Share Purchase Agreement to acquire 100% of Australian Bearings Corporation Pty Ltd (ABC Heavy Engineering) and Tincone Pty Limited (Tincone Industrial Services), including their wholly owned subsidiaries, for upfront consideration of A$135.0 million and a potential total consideration of up to A$185 million including a cash earn-out of up to A$50.0 million over three years.

Key Points

  • Upfront consideration of A$135.0 million comprises A$65.0 million cash and A$70.0 million in Tasmea scrip (5,833,333 new TEA shares at A$12.00 per share)
  • Earn-out of up to A$50.0 million cash over CY27–29, subject to ABC Group achieving annual EBITA of A$35.0 million or more
  • Upfront EBITA multiple of approximately 3.9 times based on forecast ABC Group FY27e EBITA of A$35.0 million
  • Approximately 14% forecast pro forma EPS accretion in FY27e, with Tasmea pro-forma forecast EPS of approximately 54.5 cents per share
  • Settlement targeted on or about 31 December 2026, subject to ACCC approval and other customary conditions precedent

ABC Group Profile and Transaction Structure

ABC Group is a Mackay-based specialist industrial engineering services group servicing the resources-rich Central Queensland Bowen Basin. ABC Heavy Engineering was founded in 2001 and Tincone Industrial Services was established in 1997, both based in Paget, Mackay, Queensland. The group has a skilled workforce of 427 employees (344 FTE), holds 12 Master Services Agreements, and has a Tier 1 mining customer base. According to the filing, approximately 94% of forecast FY27 revenues are secured or recurring. ABC Group is active on 16 metallurgical coal operating mine sites in the Bowen Basin, with an average mine life of approximately 25 years.

Financial Terms and EPS Impact

The A$135.0 million upfront consideration will be funded through A$65.0 million cash drawn from existing cash reserves and a new syndicated debt facility, and A$70.0 million in Tasmea scrip issued to vendors. The shares are not subject to escrow and carry a floor price guarantee exercisable on 15 November 2027. The earn-out of up to A$50.0 million is payable at up to A$16.667 million per year over CY27–29, reducing by A$1.50 for every A$1.00 of EBITA shortfall below A$35.0 million. Forecast post-deal net debt to pro forma FY27e EBITDA is disclosed as less than 1.0 times. ABC Group is forecast to comprise approximately 14% of Tasmea's Group pro forma FY27e Underlying EBITA and NPATA.

ABC Group's Services and Bowen Basin Presence

ABC Group's integrated offering spans workshop engineering and fabrication, field services and project management, heavy equipment, transport and cranes, and specialist industrial services including abrasive blasting, protective coatings, access and rigging, industrial cleaning and concrete remediation. The group serves sectors including mining and resources, energy, marine, ports, infrastructure, rail and construction. ABC Group holds differentiated intellectual property including a patented hard-surfacing wear reclamation process and unique in-situ and off-site induction hardening capabilities. The filing also states ABC delivered revenue growth of approximately 14% CAGR over the three years from FY23 to FY26, with EBITA to operating cash flow averaging approximately 99% across FY26 and forecast FY27.