Resource Minerals International (ASX:RMI) has reported surface rock sampling assay results of up to 55.80 g/t gold and 5.0% copper from its Shaib Marqan Project in Saudi Arabia, with eight samples returning gold grades of at least 10 g/t Au and 41 samples returning at least 1 g/t Au from the 91.88 km² project area.

Key Points

  • Highest gold assay of 55.80 g/t Au recorded from a smoky vein-type sample within a historical working at Shaib Marqan
  • Eight samples returned gold grades of at least 10 g/t Au; 41 samples returned at least 1 g/t Au
  • Significant copper results include 5.0% Cu and 1.3% Cu from selected samples
  • Samples from two programs have defined mineralisation over 1.2 km of strike to date
  • A regional soil sampling program has been completed, with assays to be reported in the near term

Shaib Marqan Surface Rock Sample Assay Results

The latest laboratory results from surface rock samples collected during the ongoing exploration program at Shaib Marqan returned multiple high-grade gold assays. In addition to the peak result of 55.80 g/t Au, selected samples recorded 32.70 g/t Au, 32.10 g/t Au with 0.51% Cu, 15.60 g/t Au with 0.16% Cu, 13.75 g/t Au, 12.25 g/t Au with 0.24% Cu, 11.05 g/t Au, and 10.85 g/t Au. The company disclosed that the gold and copper assay results are decoupled, with only eight of the 40 high-Au samples having copper grades of at least 1,000 ppm. The results are described as preliminary, with the relationship between gold mineralisation, copper-bearing veins and mapped geological structures still to be investigated.

Project Location and Geological Context

Shaib Marqan is located approximately 240 km south-southwest of Riyadh in the southern section of the Ar Rayn Terrane within the Arabian Shield, covering an area of approximately 91.88 km². The company's field exploration has identified 28 historical workings, with workings ranging from approximately 50 m to 250 m in mapped strike extent. Geological mapping has identified five dominant vein types, several containing visible copper minerals. The current program builds on October 2025 rock sampling and a March 2026 ground magnetic survey, which identified four priority geophysical target zones designated Z1 to Z4. A previously completed ground magnetic survey covered 932 line-km.

Soil Geochemistry Program and Planned Drilling

A regional soil sampling program has been completed at Shaib Marqan, with assays to be reported in the near term. The company said results will provide additional geochemical information to support interpretation of geological mapping and the previously completed ground magnetic survey. Further work will assess the spatial relationship between soil anomalies, high-grade rock samples, historical workings and geophysical targets. Geological interpretation, additional surface sampling and drill target definition are planned, ahead of a proposed RC drilling program in early 2027. The company noted that further geological interpretation and systematic sampling are required to establish the distribution, width and continuity of mineralisation.