Red Metal Limited (ASX:RDM) has released its September 2026 quarterly report, disclosing continued progress on the Pre-Feasibility Study (PFS) for its Sybella Rare Earth Deposit in Queensland, fresh granite column leach test results showing 65% neodymium and 68% praseodymium extraction, and 17 new tenement applications lodged as part of its expanded "Big Copper" copper-gold exploration strategy.

Key Points

  • PFS at Sybella assessing a 20 Mt/a heap leach operation, with 10 Mt/a and 25 Mt/a alternatives also scoped, with results anticipated in the first quarter of 2027.
  • Fresh Granite column leach testing returned 65% neodymium and 68% praseodymium extraction with total acid consumption of 19 kg/t.
  • Fresh Granite accounts for 598 Mt of the 936 Mt Kary Zone Inferred Mineral Resource.
  • A 5,000 metre reverse circulation infill and extension drilling program commenced over the Kary Zone in October, with assay results expected in early 2027.
  • 17 new tenement applications lodged across a 160km x 60km belt considered highly prospective for Iron Oxide-Copper-Gold deposits.

Sybella Pre-Feasibility Study Progress and Consultant Appointments

Red Metal has commissioned three Queensland-based resource consultants — DRA Global, AMDAD and The Core Group — to design, optimise and cost the mining, processing flowsheet and associated infrastructure for the Sybella Kary Zone ores. The PFS is assessing a development concept using low-cost bulk mining techniques and simple ambient temperature weak sulphuric acid heap leach processing. The study will also scope the benefits of building an acid plant on site versus purchasing acid on the open market. The PFS is on schedule for completion during the first quarter of 2027 and is expected to provide data needed to advance off-take discussions with potential end users.

Fresh Granite Column Leach Test Results and Kary Zone Drilling

Subsequent to quarter-end on 26 October 2026, Red Metal reported results from a completed 2 metre column leach test on coarsely crushed Fresh Granite from the Kary Zone, achieving 65% neodymium and 68% praseodymium extraction with total acid consumption of 19 kg/t. Fresh Granite accounts for 598 Mt of the 936 Mt Kary Zone Inferred Mineral Resource and remains open at depth over the full 5 kilometre length and 1.5 kilometre width of the Kary Zone. Also in October, 6 metre column leach tests commenced alongside a 5,000 metre reverse circulation infill and extension drilling program, with assay results expected in early 2027.

Big Copper Expansion and Priority Exploration Activity

Red Metal lodged 17 new tenement applications during the quarter, extending its ground position across a 160km x 60km belt considered highly prospective for Iron Oxide-Copper-Gold deposits under its "Big Copper" strategy. A high-resolution airborne gravity survey was flown over the Gulf and Three Ways copper-gold projects in Queensland, conducted alongside a concurrent Geological Survey of Queensland and Geoscience Australia regional survey. At the Nullarbor JV copper-gold project in Western Australia, an access agreement was finalised with drilling at Sharon's Dam scheduled for November 2026. At Pernatty Lagoon in Queensland, key drill sites were prepared and PACE co-funded drill grant applications were lodged.