Polymetals Resources (ASX:POL) has released its Annual Report for the financial year ended 30 June 2026, reporting the transition of its Endeavor Mine in Cobar, New South Wales from restart through commissioning and ramp-up to concentrate production, first shipments and revenue generation.
Key Points
- Endeavor Mine produced 1.08 million ounces of silver, 1,554 ounces of gold, 10,272 tonnes of zinc and 5,165 tonnes of lead during FY2026
- First ore was processed through the mill in June 2025, with saleable silver-lead and zinc concentrates subsequently produced and shipped
- A fatal underground accident on 28 October 2025 claimed the lives of two employees, Patrick 'Ambrose' McMullen and Holly Clark
- After year-end, on 7 September 2026, an updated Endeavor Mineral Resource of 20.7Mt at 7.5% zinc, 4.2% lead and 82g/t silver was announced
- Development of the Deep Zinc Lode commenced during the period, with the mill's nameplate treatment capacity approximately 100,000 tonnes per month
Endeavor Mine Production Figures for FY2026
According to the filing, production figures for FY2026 include both concentrate and direct shipping ore (DSO). Silver was produced at a processed ore grade of 122.5 grams per tonne with 79% recovery, while gold was produced at a grade of 0.14 grams per tonne with 100% recovery. Zinc was produced at a processed ore grade of 3.6% with 80% recovery, and lead at a grade of 1.8% with 79% recovery. The filing notes there is no payable gold in concentrates, but DSO assumes 100% silver and gold recovery.
Underground Accident and Operational Developments
The filing discloses that a fatal underground accident on 28 October 2025 claimed the lives of employees Patrick 'Ambrose' McMullen and Holly Clark. The company stated their loss had a profound impact on their families, the workforce and the wider Cobar community. The filing also states that development of the Deep Zinc Lode commenced during the period as part of the company's strategy to increase ore supply and more fully utilise the installed processing capacity. The Upper North Lode is described in the filing as demonstrating strong silver grades and the presence of native silver.
Post-Period Mineral Resource Update at Endeavor
The filing discloses that on 7 September 2026, following the end of the financial year, Polymetals announced an updated Endeavor Mineral Resource of 20.7 million tonnes at 7.5% zinc, 4.2% lead and 82 grams per tonne silver. The filing states that reinterpretation and drilling of the Upper Main Lode added 1.3 million tonnes of sulphide mineralisation previously considered inaccessible and located adjacent to existing underground development. The Endeavor Mine is stated to have a long operating history, having produced approximately 32 million tonnes of ore between 1983 and 2020, including approximately 92 million ounces of silver, 2.6 million tonnes of zinc and 1.6 million tonnes of lead.