Norwest Minerals (ASX:NWM) has released scoping study results for its Bulgera Gold Heap Leach Project, disclosing a base case gold price of A$5,800 per ounce and an approximate A$54 million pre-production capital requirement, based on a production target underpinned by Indicated and Inferred Mineral Resources prepared in accordance with the JORC Code (2012).

Key Points

  • Scoping study for the Bulgera Gold Heap Leach Project released, based on a base case gold price of A$5,800 per ounce
  • Approximately A$54 million in pre-production capital will likely be required to achieve the range of outcomes indicated
  • Approximately 78% of the total production target is based on Indicated Mineral Resources; approximately 22% is based on Inferred Mineral Resources
  • No Ore Reserves have been declared; further exploration and evaluation work is required before any Ore Reserves can be estimated

Bulgera Gold Project Scoping Study Overview

The scoping study was undertaken to determine the potential viability of open-pit mining and heap leach processing at the Bulgera Gold Project and to reach a decision to proceed with more definitive studies. The company disclosed that the study is a preliminary technical and economic assessment and is not sufficient to support the estimation of Ore Reserves. The scoping study results and production targets are extracted from the company's filing dated 24 November 2026, titled "Bulgera Gold Project Scoping Study Supports Viable Heap Leach Operation." The Mineral Resource Estimate is extracted from the filing dated 1 July 2026.

Capital Requirements and Funding Considerations

According to the filing, funding of approximately A$54 million in pre-production capital will likely be required to achieve the range of outcomes indicated in the scoping study. The company disclosed there is no certainty it will be able to raise that amount of funding when needed. The filing also states that such funding may only be available on terms that could be dilutive to or otherwise affect the value of existing shares. Norwest disclosed it could also pursue other value realisation strategies, including a sale, partial sale, or joint venture of the project, which could materially reduce its proportionate ownership.

Mineral Resource Basis and Competent Persons

The filing states that approximately 78% of the total production target is based on Indicated Mineral Resources, with approximately 22% based on Inferred Mineral Resources. The company noted a low level of geological confidence is associated with Inferred Mineral Resources, and there is no certainty that further exploration will result in the determination of Indicated Mineral Resources or that the production target will be realised. Mining costs, mine infrastructure, scheduling, and financial modelling were provided by Mr Andrew Hollis of Orelogy Consulting Pty Ltd, while processing plant, capital, and processing costs were provided by Mr Paul Newling of NewPro Consulting & Engineering Services Pty Ltd, both Competent Persons under the JORC Code (2012).