Marimaca Copper (ASX:MC2) has reported further assay results from its ongoing drilling program at the Pampa Medina deposit in Chile's Antofagasta Region, with drillhole SPRD-21 intersecting 102 metres of 1.0% copper and 5.1 grams per tonne silver from 706 metres downhole, among multiple significant intersections across the central zone of the deposit.

Key Points

  • SPRD-21 intersected 102m of 1.00% Cu and 5.1g/t Ag from 706m downhole, including 72m of 1.24% Cu and 6.8g/t Ag from 710m
  • SPRD-18 returned 68m of 1.13% Cu and 8.7g/t Ag from 634m, including 22m of 2.07% Cu and 10.0g/t Ag from 668m
  • SPRD-24 intersected 8m of 3.21% Cu and 27.5g/t Ag from 454m within multiple high-grade stacked mantos
  • Drilling completed at 150-metre centres within the central zone, with drill rigs moving to test northern and western extensions at Pampa Norte and Sierra Norte targets

Central Zone Drilling Results at Pampa Medina

Drilling at the Pampa Medina deposit, located approximately 28 kilometres east of the company's Marimaca Oxide Deposit, was completed on 150-metre centres within the central zone. SPRD-21 intersected 102 metres of 1.00% copper and 5.1g/t silver from 706 metres downhole, including 26 metres of 1.30% copper and 6.4g/t silver from 728 metres and 14 metres of 1.80% copper and 10.4g/t silver from 760 metres. SPRD-18, drilled 300 metres east of previously released SPRD-17, also confirmed continuity of the higher-grade sulphide manto, with near-surface oxide mineralisation extending the known oxide footprint by approximately 150 metres to the west, intersecting 68 metres of 0.36% copper and 2.7g/t silver from 142 metres.

Additional Drillhole Intersections Across the Deposit

SPRD-19 intersected 34 metres of 1.36% copper and 6.6g/t silver from 832 metres, including 18 metres of 2.07% copper and 12.4g/t silver from 834 metres. SPRD-25, drilled 150 metres south of previously released SMD-01, returned 54 metres of 1.12% copper and 9.9g/t silver from 320 metres. SPRD-26 intersected near-surface oxide mineralisation 300 metres west of the historical oxide footprint, including 84 metres of 0.62% copper and 3.2g/t silver from 226 metres. SPR-37 extended the ultra-high-grade manto 300 metres east of previous drilling, with a 4-metre interval grading 3.77% copper and 10.5g/t silver from 432 metres. SPRD-22 and SPRD-23B both intersected near-surface oxide mineralisation but were interrupted by late WNW dyke systems at depth.

Drilling Program Scope and Next Phase Targets

The Pampa Medina deposit is a manto-style copper deposit hosted dominantly in Jurassic-Triassic sedimentary units within a defined 3-kilometre by 1.5-kilometre area of interest. Marimaca's 2026 drilling campaign is focused on three priority goals: definition of the high-grade central area of interest, delineating identified oxide extensions, and further step-out drilling to test potential extensions identified in geophysical work. The central high-grade zone drilling program is stated to be nearing completion, with drill rigs moving to test continuity to the north at Pampa Norte and to the west at Sierra Norte. Additional extension drilling within the defined area of interest remains ongoing.