Koba Resources (ASX:KOB) has been awarded up to $257,500 in co-funding from the South Australian Department for Energy and Mining through its PACE Minerals initiative to advance exploration at the Everest Uranium Prospect within the company's Yarramba Uranium Project in South Australia.
Key Points
- The South Australian Government will co-fund 50% of eligible expenditure, capped at $257,500, under the PACE Minerals initiative.
- Funded work includes detailed passive seismic and ground gravity geophysical surveys covering approximately 142 line-kilometres, followed by a 30-hole, approximately 3,500-metre drilling program.
- Broadly spaced drilling at Everest has intersected multiple intervals grading above 1,000ppm eU3O8 along a 6km mineralised trend.
- Geophysical surveys are planned for Q1 2027, with follow-up drilling targeted for mid-2027, subject to permitting and survey interpretation.
- Drilling continues at the company's Stannary Hills Tin-Tungsten Project, with 14 holes completed for 2,170 metres, with all assay results pending.
PACE Co-Funding Terms and Approved Work Program
Under the PACE Minerals initiative, the South Australian Government will co-fund 50% of the company's eligible expenditure, capped at $257,500. The approved program comprises detailed passive seismic and ground gravity geophysical surveys across the 6km Everest Trend, covering approximately 142 line-kilometres with around 1,500 stations spaced at 100-metre intervals east–west along traverses spaced 200 metres apart north–south. Following interpretation of the geophysical data, a 30-hole, approximately 3,500-metre drilling program will focus on the 6km mineralised trend and its potential extensions, testing targets identified from geophysical data and following up on high-grade uranium intersections.
Everest Prospect Drilling Results and Mineralised Trend
Drilling at the Everest Prospect to date has delineated uranium mineralisation along a 6km strike length, with existing drill lines remaining broadly spaced at more than 400 metres apart. Significant results from the 2026 drilling program include 1.5 metres at 790ppm eU3O8 from 103.2 metres, including 0.6 metres at 1,627ppm eU3O8; 1.1 metres at 537ppm eU3O8 from 90.4 metres, including 0.4 metres at 1,003ppm eU3O8; 1.1 metres at 512ppm eU3O8 from 97.3 metres, including 0.4 metres at 1,000ppm eU3O8; and 1.0 metres at 548ppm eU3O8 from 87.3 metres, including 0.4 metres at 1,002ppm eU3O8. The Everest Prospect is located 4km north of and along strike from the 12Mlb Jason Uranium Deposit and 17km north of the Honeymoon Uranium Mine, both owned by Boss Energy (ASX:BOE).
Yarramba Uranium Project Scope and Forward Work Plan
The Yarramba Uranium Project encompasses more than 250km of uranium-bearing palaeochannels and over 5,000 square kilometres of tenure. The company acquired the project in January 2024 and has since discovered high-grade mineralisation at four new prospects: Everest, Berber, Delord and Chivas. The 2026 drilling program extended the strike length of the high-grade mineralised trend at Everest by 50% to 6km. Planning is underway for the PACE-funded program, with geophysical surveys scheduled for Q1 2027, drilling permits to be obtained following geophysical data interpretation, and extensional and infill drilling targeted for mid-2027, subject to permitting.



Please wait processing your request...