FireFly Metals (ASX:FFM) has announced its second significant copper-gold discovery in a month at the Green Bay project in Newfoundland and Labrador, Canada, with the Nash Volcanogenic Massive Sulphide discovery returning rock chip samples as high as 19.8% copper and drill intersections including 26.7 metres at 2.3% copper from just 9.0 metres downhole.
Key Points
- Nash discovery located less than 10km from the Ming Mine, defined by a +3km-long airborne electromagnetic conductive anomaly
- Maiden drilling returned 26.7m at 2.3% copper from 9.0m downhole, including 9.6m at 4.6% copper in hole FFR26-24
- 44 individual surface rock chip samples returned greater than 1% copper, with highs of 12.2%, 12.7%, 16.4% and 19.8% copper
- FireFly granted exclusive option to acquire the contiguous Brass Buckle property of 16.5km² immediately adjacent to the Nash discovery
- Company held approximately A$349.7 million in cash and liquid investments (unaudited) as at 30 September 2026
Nash Discovery Drill Results and Surface Sampling
FireFly's maiden drill campaign at Nash returned thick near-surface copper intersections, with hole FFR26-24 intersecting 26.7 metres at 2.3% copper from just 9.0 metres downhole, including a high-grade zone of 9.6 metres at 4.6% copper. Hole FFR26-36 intersected 21.3 metres at 1.2% copper from 21.7 metres downhole. Surface trenching confirmed mineralisation outcropping at surface, with linear rock-saw channel samples returning continuous intersections of 24.0 metres at 1.2% copper, 10 metres at 2.2% copper, 5.0 metres at 3.5% copper, and 4.0 metres at 5.2% copper. The majority of the Nash EM anomaly remains untested, with mineralisation open in all directions.
RDI Prospect and Brass Buckle Property Acquisition
The RDI Prospect, located 1.1 kilometres from the Nash discovery along the same geophysical trend, returned a maiden shallow drill intersection of 11.2 metres at 1.2% copper from 15.9 metres downhole, including 4.0 metres at 2.3% copper in hole FFR26-043. FireFly also signed an option agreement to acquire the Brass Buckle project from Krinor Resources Inc. and local prospectors. The Brass Buckle tenure consists of 16.5 square kilometres of exploration claims contiguous to the Nash and RDI prospects, situated less than 10 kilometres southeast of the Ming Mine.
Green Bay Mineral Resource and Forward Work Programme
The current Green Bay Mineral Resource Estimate stands at 60.2 million tonnes at 2.4% copper equivalent in the Measured and Indicated categories, plus a further 23.5 million tonnes at 2.5% copper equivalent in Inferred Mineral Resources. Three surface rigs are continuing with regional drilling, with further assay results expected over coming weeks. Near-term activities include six underground drill rigs upgrading the Mineral Resource through infill drilling, completion of a Feasibility Study in Q1 2027, and advancement of permitting, engineering and early works. A Mineral Resource Estimate update is scheduled for March 2027.



Please wait processing your request...