E79 Gold Mines (ASX:E79) has presented its Annual General Meeting materials for 18 November 2026, disclosing a market capitalisation of $9.2 million, shares on issue of 353,555,680, and a share price of $0.026, alongside details of its three Australian exploration projects targeting gold and copper.
Key Points
- 353,555,680 shares on issue as of the AGM date, with top 20 shareholders holding 42.3% and board and management holding approximately 11.3%
- Three exploration projects in Australia: Cue Gold Project (67km² in the Day Dawn goldfields), a Laverton Tectonic Zone project (272km²), and a McArthur Basin project (1,366km²)
- A recently announced joint venture agreement covers 698km² of tenure in the Murchison Goldfield, with the original agreement referenced as an company update dated 14 February 2025
- Over 40 targets identified from a gravity survey at the Cue Gold Project, with 14,285,715 Deferred B Consideration Shares yet to be issued related to the Cue acquisition
Corporate Structure and Board Composition
According to the filing, E79 Gold Mines has a board comprising Non-Executive Chair Chris Cairns, Non-Executive Directors Deborah Lord, Peter Ironside, and Matthew Bowles, along with Chief Executive Officer Ned Summerhayes, Technical Consultant Glenn Martin, and Company Secretary Amanda Sparks. The company's cash position as at 30 September 2026 was disclosed at $1.94 million. The filing notes that 14,285,715 Deferred B Consideration Shares related to the Cue acquisition remain to be issued and are excluded from the current shares on issue total.
Cue Gold Project Exploration Targets
The filing details multiple advanced exploration targets at the Cue Gold Project within the Day Dawn goldfields of the Murchison region. The Ada target features 950 metres of gold anomalism, with historical drill intersections including 13 metres at 2.2 grams per tonne gold from 112 metres downhole in GCRC936, and 16 metres at 1.53 grams per tonne gold from 48 metres in AUSI790. The Chloe target, described as sitting within an interpreted structure connected to Westgold Resources' recently mined Yellow Taxi mine, returned 4 metres at 6.96 grams per tonne gold from 90 metres in GCRC944, including 2 metres at 13.04 grams per tonne gold from 90 metres.
Additional Targets and Gravity Survey Results
The filing also discloses the Transformer and MBA23 targets at the Cue Gold Project. The Transformer target returned 5 metres at 2.92 grams per tonne gold from 30 metres in LAC0540 and 8 metres at 1.37 grams per tonne gold from 24 metres in LAC0456. The MBA23 target, described as an area of shales and felsic volcanics mapped as granite, returned 4 metres at 4.38 grams per tonne gold from 35 metres. A gravity survey has identified over 40 targets across the project area. Exploration results referenced in the presentation are sourced from E79 company updates dated 3 October 2025 and 26 November 2025, with Ned Summerhayes named as the Competent Person under the 2012 JORC Code.