BHP Group (ASX:BHP) reported total copper production of 400.7 kt for the quarter ended 30 September 2026, a 19% decline compared with the same period last year, while iron ore production from WAIO rose 4% year-on-year and full-year production guidance across all assets remained unchanged, according to the company's quarterly operational review released on 20 October 2026.
Key Points
- Total copper production fell 19% to 400.7 kt in Q1 FY27, with FY27 guidance unchanged at 1,650–1,800 kt
- WAIO iron ore production reached 64.3 Mt (BHP share), up 4% on Q1 FY26, with record performance at both mine and port
- Jansen Stage 1 potash project is 87% complete and on track for first production in mid-CY27
- US$0.8 bn (100% basis) of pre-commitment funding approved for the Escondida New Concentrator
- Two fatalities were recorded during the quarter, at Escondida and Peak Downs, with investigations underway
Copper Production Decline Across Multiple Assets
Copper production decreased across several operations during Q1 FY27. Escondida produced 252.6 kt, down 23% on Q1 FY26, reflecting planned lower concentrator feed grade of 0.81% (Q1 FY26: 0.94%), scheduled maintenance, a temporary suspension of all mining activities following a fatal incident on 23 September, and severe weather in July and August. Pampa Norte (Spence) produced 47.4 kt, down 15%, due to planned lower feed grade of 0.53% (Q1 FY26: 0.65%) and ore variability challenges. Copper South Australia produced 60.7 kt, down 16%, primarily due to an underground conveyor belt failure at Carrapateena, with the replacement belt installed and operating at full capacity by the end of the quarter. Antamina produced 40.0 kt, up 18% on Q1 FY26. The average realised copper price was US$7.01/lb, compared with US$4.59/lb in Q1 FY26.
Bulk Commodities Performance and WAIO Records
BHP's bulk commodities segment recorded a strong start to FY27. WAIO produced 64.3 Mt (BHP share) and 71.9 Mt on a 100% basis in Q1 FY27, both representing a 4% and 2% increase respectively on Q1 FY26, with the filing noting records set at both mine and port during a period of significant planned maintenance. BMA steelmaking coal production was 4.9 Mt (BHP share) and 9.8 Mt on a 100% basis, up 1% on Q1 FY26. NSW Energy Coal production was 4.4 Mt, up 26% on Q1 FY26, attributed to higher bypass coal. Samarco iron ore production was 2.2 Mt, up 4% on Q1 FY26. Full-year guidance for all bulk commodity assets remained unchanged.
Growth Projects and Strategic Transactions
BHP disclosed several developments across its growth pipeline during the quarter. The Jansen Stage 1 potash project in Canada reached 87% completion and remains on track for first production in mid-CY27. The company announced an increase to Olympic Dam's mineral resource base and renamed the Oak Dam exploration project 'Ankata' in recognition of its cultural significance to the Kokatha people, as part of a strategy to grow Copper South Australia production to approximately 500 ktpa by 2035 and up to 650 ktpa by 2040. BHP signed a memorandum of understanding with KGHM Polska Miedź S.A. to explore collaboration at Spence and Sierra Gorda, and completed a transaction with Faraday to divest its San Manuel legacy asset while increasing its interest in Faraday to 32% on a non-diluted basis.