Australian Gold and Copper (ASX:AGC) has released new assay results from its maiden diamond drilling campaign at the Evergreen Prospect in NSW, with the northernmost hole to date, 26DDBR007, returning 21 metres at 0.4g/t gold, 5g/t silver and 6.4% lead-plus-zinc from 229 metres, including a high-grade interval of 1.4 metres at 0.7g/t gold, 16g/t silver and 22.6% lead-plus-zinc from 241 metres.

Key Points

  • Northernmost hole 26DDBR007 returned 21m at 0.4g/t Au, 5g/t Ag and 6.4% Pb+Zn from 229m, including 12m at 0.5g/t Au, 6g/t Ag and 8.2% Pb+Zn from 233m
  • Deeper hole 26DDBR008 intersected 2m at 1.1g/t Au, 17g/t Ag and 10.3% Pb+Zn from 479m, confirming mineralisation continues at depth
  • Diamond drilling at Evergreen has been completed with 17 holes drilled for 5,631.9 metres since mid-April; assays are pending for a further eight holes
  • A reverse circulation drill rig has been mobilised to target the shallow weathered oxide zone as the company advances Evergreen towards an initial Mineral Resource Estimate

Evergreen Drilling Results Across Multiple Structural Positions

The Evergreen Prospect is part of AGC's Browns Reef Project in NSW. The drilling program was designed to test beneath historical silver-gold-base metal mineralisation and has intersected zinc, lead, copper, gold and silver mineralisation across multiple positions within the system. Central hole 26DDBR003 intersected multiple mineralised zones, including 2 metres at 30g/t silver and 1.1% copper from 328 metres, 6 metres at 5.9% lead-plus-zinc from 338 metres, and 3 metres at 0.2g/t gold, 15g/t silver, 9.4% lead-plus-zinc and 0.3% copper from 360 metres. Southernmost hole 26DDBR002 returned 5 metres at 0.2g/t gold, 12g/t silver, 7.9% lead-plus-zinc and 0.3% copper from 310 metres.

Depth Extensions and Northern Strike Confirmed at Evergreen

Hole 26DDBR008 confirmed mineralisation continues at depth, returning 1 metre at 59g/t silver, 14.3% lead-plus-zinc and 0.2% copper from 427.6 metres, and 2 metres at 1.1g/t gold, 17g/t silver and 10.3% lead-plus-zinc from 479 metres. The northernmost hole 26DDBR007 confirmed high-grade mineralisation remains open to the north, with further northern step-out holes 26DDBR011 and 26DDBR016 pending assays. The filing states mineralisation remains open along strike, at depth and up-dip towards surface. The new results build on previously reported holes 26DDBR004 and 26DDBR006, with holes 26DDBR012, 26DDBR014 and 26DDBR015 targeted up-dip from 26DDBR004 also pending assays.

RC Drilling Mobilised Ahead of Initial Mineral Resource Estimate

Diamond drilling has now been completed at Evergreen across 17 holes totalling 5,631.9 metres since mid-April. A reverse circulation drill rig has been mobilised to target the shallow weathered oxide zone. The company said it is advancing Evergreen towards an initial Mineral Resource Estimate. According to the filing, the company holds a 2,600 square kilometre landholding in the South Cobar Basin, NSW. As at 31 July 2026, the company reported cash of A$7 million and no debt, with 332 million shares on issue, 7.5 million options and 11.5 million performance rights outstanding.