Aguia Resources (ASX:AGR) disclosed record gold production of approximately 37 ounces from its Santa Barbara gold and silver project in Colombia during September 2026, generating gross revenue of AUD$218,000 based on a gold price of US$4,135 per Troy ounce, with the company's Colombian corporate and operating costs met for the first time.

Key Points

  • September 2026 gold production reached approximately 37 ounces from 105 dry tonnes of run-of-mine material, compared with approximately 32 ounces in the prior month.
  • Gross revenue of AUD$218,000 was generated based on a gold price of US$4,135 per Troy ounce, with 2,124 grams of payable silver also recovered.
  • Average head grade for September was 10.88 g/t Au, with a recent batch assessed at 12.75 g/t Au.
  • Additional mining equipment has been acquired to support a ramp-up in production from approximately 100 tonnes per month to 200 tonnes per month before Q1 2027.
  • The company reduced its mine workforce by 15% in September to lower operating costs.

September Production and Processing Results

In September 2026, the Santa Barbara project produced 105 dry tonnes of run-of-mine material at an average head grade of 10.88 g/t Au. All 105 tonnes were sent to the Quintana Processing Plant in Remedios, Antioquia, a third-party facility owned by Colombian Mint, part of the Sun Valley Investment group. The plant recovered 1,143.07 grams of gold, equivalent to 36.75 Troy ounces, along with 2,124 grams of payable silver. Under the processing agreement, the company receives 90% of gold produced, less processing costs of USD$65 per tonne. The filing states all September production will continue to be directed to the Colombian Mint facility.

Workforce Reduction and Equipment Acquisition

During September, Aguia Resources reduced its mine workforce by 15% to lower operating costs at the Santa Barbara project. The company also purchased additional mining equipment to continue developing three shafts below the main levels of Veins #1 and #2, along with extraction fans to improve post-blast ventilation. These measures are disclosed as supporting a short-term plan to increase mine production to more than 200 tonnes per month by the end of 2026. The filing states this ramp-up target is to be achieved from the current level of approximately 100 tonnes per month.

Brazilian Phosphate Assets Update Pending

According to the filing, Managing Director and CEO Timothy Hosking said the company expects to update shareholders within the following week on its phosphate assets in Brazil. The filing states that sales are materialising from stockpiled material and that operations are continuing at the Brazilian phosphate projects. Aguia Resources describes itself as a multi-commodity company with pre-production phosphate projects located in Rio Grande do Sul, Brazil, in addition to its gold projects in Bolivar, Colombia. The technical information in the filing was reviewed and approved by Competent Person Raul Sanabria, M.Sc., P.Geo., EurGeol.