Key Highlights

  • Infinity entered an option agreement to acquire 100% of the Tule Canyon molybdenum-copper porphyry target in the United States.
  • The Swansea copper project area grew 47%, from 34 to 50 lode claims.
  • Underground adit sampling at Tule Canyon confirmed broad zones of molybdenum mineralisation, according to the company.
  • Cash was A$3.1 million at 30 September 2026, and drilling at Yambacoona tin was suspended on 26 October 2026 after heavy rain.

Infinity Metals Limited (ASX:INF) reported its quarterly activities for the period ending 30 September 2026 on 20 October 2026, and followed with a drilling update on its Yambacoona tin project in New South Wales on 26 October 2026. The company said it has entered an option to acquire a molybdenum-copper porphyry target in the United States and expanded its Swansea copper claims, while drilling at Yambacoona was halted by rainfall.

Tule Canyon Molybdenum-Copper Option

The company has entered an option agreement to acquire 100% of the Tule Canyon molybdenum-copper porphyry target. The company describes the project as large and strategically important, located in a Tier 1 jurisdiction. It cites historical non-JORC estimates for drilled, outcropping and adit exploration areas.

Underground adit sampling is reported to have confirmed broad, high-grade molybdenum zones, with an acid-leached cap grading into higher grades and greater alteration at depth. The company says these features are typical of porphyry systems.

Swansea Copper Project and Yambacoona Drilling

The Swansea copper project area was expanded by 47%, from 34 to 50 lode claims, covering more than 5 km of interpreted mineralised structure and historical workings.

At Yambacoona, drilling began on 21 October 2026 and was suspended after more than 30 mm of rain fell near Brewarrina on 22 October. Access roads are being allowed to dry out to prevent damage, and the rig will move to another Job before returning.

Corporate Position

The company reported cash of A$3.1 million at 30 September 2026, and said it is considering pathways forward for its portfolio.

Sector Context and Risks to Watch

Molybdenum and copper porphyry targets depend on drilling to test grade and continuity, and historical non-JORC estimates do not establish a resource. Rain-related stoppages at tin projects are a common source of delay, and access restrictions can extend these timelines.

The main risks are the outcome of option conditions at Tule Canyon, the restart of Yambacoona drilling and the funding of further work from the company's cash balance. Future reports will show whether drilling resumes and whether the option proceeds.

Final Word

Infinity has added a molybdenum-copper option and a larger Swansea claim package, while its Yambacoona drilling has paused for weather. Future updates are expected to report the option terms, the restart of drilling and the next steps at Tule Canyon.