Key highlights
- Vertex Minerals (ASX:VTX) reported approvals that expand available underground working hours at Reward.
- Vertex sold 142 ounces of gold during the September quarter and reported 62% mill recovery.
- The revised Reward resource contained an estimated 146,900 ounces of gold.
Vertex Minerals (ASX:VTX) was quoted at AUD 0.070 on 20 November 2026, down 11.39% for the session. The S&P/ASX 200 was also lower during the session. The company, a gold producer and developer in New South Wales, reported expanded underground operating hours and September-quarter production at Reward on 30 October 2026.
Reward receives approval for longer underground operations
Vertex Minerals’ 30 October 2026 Quarterly Report detailed changes to the operating approvals for the Reward Gold Mine in New South Wales. In August, Bathurst Regional Council approved a modification permitting 24-hour underground operations and removing the previous 9 a.m. to 3 p.m. firing window. The New South Wales Environment Protection Authority issued a corresponding varied licence in September. Vertex estimated these changes would expand available underground working time from about nine hours to about 22 hours a day using existing equipment. The approval permits a different operating schedule. Actual hours depend on mine operations.
The first mechanised stope and equipment changes
Vertex reported first production firing of a trial long-hole open stope at Decline 3 targeting the Mica 1 lens. This was the first mechanised stope at Reward. It also reported equipment modifications intended to allow smaller development profiles and reduce dilution, which occurs when waste rock is mined with mineralised material. A drive breakthrough provided conventional loader access to a high-grade Mining area at Paxtons South. A second underground truck arrived on site on 13 October. Construction of a dedicated long-hole production rig was completed at the end of September, with arrival at Sydney anticipated in mid-November.
September gold sales and the updated resource
Vertex sold 142 ounces of gold in the quarter and held another 82 ounces at 30 September. It began processing ore from the trial stope through its gravity plant in August and reported 62% mill recovery for the September quarter. The plant’s varied licence permits processing between 6 a.m. and 6 p.m. seven days a week. An updated Mineral Resource Estimate published in September put Reward at 274,000 tonnes at 16.68 grams of gold per tonne for 146,900 ounces. Indicated grade rose 36% to 21.17 grams per tonne, while total resource ounces declined 35% compared with June 2023.
Underground production and processing schedules
The time available underground affects when Vertex can develop workings, mine ore and move material to the plant. The licence sets separate operating hours for the processing facility. A stope produces a quantity of material of varying grade that can be compared with the company’s planning assumptions. The Yield from processing depends on feed characteristics and recovery. Vertex’s quarterly sales record measures gold sold, while ounces held at period end and reported metallurgical recovery describe different parts of operations. The updated resource is a geological estimate and provides a separate measure from quarterly production.
Dilution, recovery and ramp-up
Vertex reported that the grade delivered to the plant from the first trial stope was below its expectation. It expects smaller mining profiles to help reduce dilution, with realised performance dependent on later operating results. The expanded hours provide the option of longer daily underground operations. Equipment availability, mine development and coordination with plant hours can affect how that option is used. Increased Indicated grade and fewer total resource ounces also describe different aspects of the updated estimate. The company’s ability to extract and process material depends on site conditions and the sequence of mining at available stopes.
Operating data to follow at Reward
The next operating comparisons can show how the revised schedule and additional equipment affect ore Supply and output. Sales, ounces held, feed grade and gravity plant recovery each describe a different point in the operating cycle. The arrival and commissioning of the production rig are separate from the grant of the approvals. Further results from mechanised stoping will help show whether narrower mining profiles and changes to equipment translate to lower dilution in actual workings. The September report provides a baseline for those measurements while the operation introduces changes.
Reward after the September quarter
Vertex has approvals for longer underground working hours and has begun mechanised stoping trials. Subsequent figures will measure how the changes affect production and processing.