Sierra Madre Gold and Silver has commenced underground development at the Nazareno silver and gold mine, part of the La Guitarra silver-gold complex in Estado de Mexico, Mexico. As of now, more than 700 tonnes (t) of mineralised material has been transported from Nazareno to the Guitarra processing plant. Development blasting and detailed mapping at Nazareno has revealed multiple silver and gold-bearing veins converging in this region, creating a zone that spans up to 8m in width. During a reconciliation of silver-gold material produced from development blasting with the surrounding resource blocks in the 2023 Nazareno resource model, it was found that the production silver grades are 40% higher and gold grades are 30% higher. This is based on a comparison of the grades delivered to the mill versus those indicated in the 2023 resource block model for the surrounding area. Sierra Madre CEO Alex Langer said: "We are excited to be opening a third mining centre at La Guitarra, less than a year after achieving commercial production at our first mine within the complex. “We expect Nazareno to be a significant contributor to silver and gold production as we advance our fully funded plant expansion plans, which would more than double capacity from current 500t/d [tonnes per day] levels by Q3 2027 [third quarter of 2027].” The initial phase of development at the Nazareno Access Drive level will involve expanding the sides of the current workings through blasting to reach the full width of the mineralised silver-gold zone. Following this, the sill drive will be extended along the structure in both directions. This process aims to assess the feasibility of employing long-hole mining in this area, which is characterised by closely spaced veins. To support mine planning and development, Sierra Madre has purchased a new Ingertrol Sandy 50 drill rig. With the ability to drill 150m with NWL pipe and 250m with BWL pipe, the portable rig can be used both underground and on the surface. For surface drilling, there is no need to build access roads because its components are portable and can be carried by individuals. This was demonstrated by the company during its drilling operations at the Tepic project. Drilling is scheduled for the Nazareno veins and the central Guitarra mine area. These locations contain closely spaced parallel silver-gold vein sets, which have traditionally necessitated parallel exploratory sill drives. The new drilling rig will enable the company to cut down on development expenses by allowing for short-hole drilling from a single drive, eliminating the need for expensive parallel drives or crosscuts. Story Continues "Sierra Madre commences underground development at Nazareno mine in Mexico " was originally created and published by Mining Technology, a GlobalData owned brand. The information on this site has been included in good faith for general informational purposes only. It is not intended to amount to advice on which you should rely, and we give no representation, warranty or guarantee, whether express or implied as to its accuracy or completeness. You must obtain professional or specialist advice before taking, or refraining from, any action on the basis of the content on our site. View Comments
Sierra Madre commences underground development at Nazareno mine in Mexico
You are reading a free article with opinions that may differ from the recommendation given by Kalkine in its paid research reports. Become a Kalkine member today to get access to our research reports, in-depth technical and fundamental research.
Start Your Free Trial Now!Not sure where to invest today?
Kalkine’s latest research highlights three companies identified through in-depth analysis and market insights.
Explore these research reports to learn about companies currently being tracked by our analysts and make more informed investment decisions.
View 3 Research ReportsThis information, including any data, is sourced from Unicorn Data Services SAS, trading as EOD Historical Data (“EODHD”) on ‘as is’ basis, using their API. The information and data provided on this page, as well as via the API, are not guaranteed to be real-time or accurate. In some cases, the data may include analyst ratings or recommendations sourced through the EODHD API, which are intended solely for general informational purposes.
This information does not consider your personal objectives, financial situation, or needs. Kalkine does not assume any responsibility for any trading losses you might incur as a result of using this information, data, or any analyst rating or recommendation provided. Kalkine will not accept any liability for any loss or damage resulting from reliance on the information, including but not limited to data, quotes, charts, analyst ratings, recommendations, and buy/sell signals sourced via the API.
Please be fully informed about the risks and costs associated with trading in the financial markets, as it is one of the riskiest forms of investment. Kalkine does not provide any warranties regarding the information on this page, including, without limitation, warranties of merchantability or fitness for a particular purpose or use.
Please wait processing your request...