Highlights
- Resource Base (ASX:RBX) limited Gawler Craton work to desktop evaluation in the September 2026 quarter.
- Mitre Hill carries an inferred resource of 21 million tonnes at 767 ppm total rare earth oxides.
- Exploration and evaluation spending for the quarter was about A$20,000.
- Cash was A$593,000 at 30 September, with an estimated 4.1 quarters of funding.
- The FY26 audit included an emphasis of matter on going concern.
Resource Base Limited (ASX:RBX) raised fresh Equity in August 2026, but its exploration remains largely on paper. Its September quarter report, released on 30 October 2026, said work on its Gawler Craton tenements in South Australia was confined to desktop evaluation, with no on-ground exploration, and that no exploration was carried out at its Mitre Hill rare earths project. Total exploration and evaluation spending for the quarter was about A$20,000.
What Resource Base Holds
Resource Base is an early-stage explorer with two 100%-owned areas. In the Gawler Craton it holds EL7054, about 100 kilometres south of Coober Pedy, and EL7060, about 15 kilometres south of Tarcoola, with a focus on titanium in heavy mineral sands and in titanium-bearing anorthosite rocks. Its second asset is the Mitre Hill clay-hosted rare earths project on the South Australia and Victoria border, which carries a JORC inferred mineral resource of 21 million tonnes at 767 ppm total rare earth oxides, first announced in February 2023.
Progress at the Gawler Craton
The annual report, released on 29 September 2026, set out the groundwork done during the year. For EL7054, a deed with the Department of Defence announced in February 2026 provides for exploration within the Woomera Prohibited Area, which the company said removed the main access constraint. At EL7060, a review of historic drilling in March identified anorthosite rocks, with several holes above 1% titanium and a peak of about 1.5%, and satellite spectral analysis in April outlined three priority target clusters for field checking. These are historic data and remote-sensing targets rather than new drill results, and no resource exists at either tenement. The Quarterly Report did not set out a field programme or timetable, and Resource Base (ASX:RBX) said it continues to review new project and corporate opportunities.
Cash, Placement and Going Concern
Resource Base ended FY26 with cash of A$140,776 and a net loss of A$714,802, and the auditor included an emphasis of matter on a material uncertainty over the group's ability to continue as a going concern. On 31 July the company announced a placement and issued 24 million shares on 10 August, raising A$600,000. The Appendix 5B showed cash of A$593,000 at 30 September, after net operating outflows of A$143,000 and A$564,000 of net financing inflows. The company estimated 4.1 quarters of funding and reported no Loan facilities.
Risks
The key risks for Resource Base (ASX:RBX) are limited activity on the ground, reliance on further equity to fund any drilling, and the possibility of further dilution. Titanium and rare earths both face price Volatility and competing projects, and Mitre Hill has not been advanced recently. Any change of strategy through new opportunities would bring its own uncertainty.
Key Insights
Resource Base (ASX:RBX) holds titanium tenements with historic drilling and remote-sensing targets and a small rare earths resource, but its recent activity has been desktop work only. The company's disclosures show a recently strengthened cash balance alongside a Going Concern emphasis, so any move to field work depends on further funding.