Highlights

  • 88 Energy (ASX:88E) is planning the Franklin Bluffs-1H Horizontal Well at Project Phoenix in Alaska.
  • The company says a full carry has been secured for a drilling and production testing program.
  • A farm-out of the Augusta-1 prospect is in progress, with multiple parties reviewing data.
  • The first licence period for Namibia's PEL 93 concludes in October 2026.

88 Energy Limited (ASX:88E) is an oil and gas exploration company with a portfolio on Alaska's North Slope and a 20% working interest in Petroleum Exploration Licence 93 in Namibia's Owambo Basin. In the 24 November 2026 session, shares were priced at AUD 0.017, down 5.56%. The company's 2026 investor communications focus on Project Phoenix, farm-out discussions and the Namibian licence.

Business Overview

ASX:88E's strategy is to de-risk assets and sequence drilling only when technical, funding and partner criteria are met. Its Alaska portfolio includes Project Phoenix, South Prudhoe, Kad River East and the Augusta prospect, with Namibia providing frontier exposure. Management has stated an approach of limiting dilution through carried or partner-funded structures.

Project Phoenix and Franklin Bluffs-1H

At Project Phoenix, the company is planning a horizontal well, Franklin Bluffs-1H, followed by a long-term test intended to confirm reservoir performance and deliverability. In an April 2026 investor presentation, management said a farm-out with Burgundy established a full carry for a material drilling and production testing program, without publishing percentages or dollar amounts. The company's Q&A page does not state a spud or test date, and development planning would follow only if results support it.

Augusta-1, Kad River East and Namibia

88 Energy owns 100% of the Augusta-1 prospect, where a farm-out is in progress and multiple parties are reviewing the data room. At Kad River East in Alaska, full 3D seismic has been acquired and prospectivity assessment is continuing. In Namibia, the first licence period for PEL 93 concludes in October 2026, and the joint venture must elect whether to enter a second period that includes a committed first well. Completed work on the licence includes 200 km of 2D seismic and a gravity and magnetic survey, and the company is awaiting production test results from an offset operator.

Financial Context

The company's investor Q&A does not disclose a cash balance or raise amounts, and ASX:88E, as an exploration company, reports no operating revenue. Its near-term activity depends on partner funding and potential farm-out proceeds. Oil and gas prices and market conditions influence both partner appetite and the pace of drilling.

Risks to Consider

Management has noted uncertainty ahead of the Augusta farm-out and drilling outcomes, open questions on funding structures and dilution, and that Phoenix long-term test results are unknown until testing is complete. ASX:88E also faces exploration risk, the timing of partner decisions and licence commitments in Namibia.

What to Watch Next

Items for investors to monitor include completion of the Augusta-1 farm-out, the joint venture's decision on the PEL 93 second licence period, scheduling of the Franklin Bluffs-1H test and results from offset operators in Namibia. Quarterly reports from ASX:88E will provide updated cash and expenditure figures.

Key Insights

88 Energy (ASX:88E) is advancing an appraisal-led strategy in Alaska funded by a partner carry, alongside a farm-out process at Augusta-1 and a licence decision in Namibia. Timing of the Phoenix well, farm-out outcomes and funding structures are the main variables for ASX:88E.