Key Highlights

  • Alurion began infill drilling and bulk sampling at the Amargosa Bauxite-Gallium Project for an updated resource estimate and pre-feasibility study.
  • Its field program includes 203 auger holes, 20 diamond twin holes and up to 16 bulk-sample trenches.
  • A road logistics study assessed haulage up to 11.5 million wet tonnes a year and identified no modelled road capacity constraints.
  • Alurion raised AUD 50 million in its IPO and began trading on the ASX on 31 July 2026.

Alurion Resources (ASX:ALU) is developing the Amargosa bauxite and gallium project in Brazil. Its September-quarter report outlined drilling, bulk sampling and export logistics work following its separation from Brazilian Rare Earths and July listing. The company is targeting an updated mineral resource estimate and pre-feasibility study for mid-2027.

Drilling and bulk sampling for the study

The program comprises 203 auger holes for 2,436 metres, 20 diamond twin holes for 800 metres and up to 16 trenches. Alurion plans to collect samples across the bauxite profile. Infill drilling is intended to increase sample density and build the geological information available for resource classification and mine planning.

Bulk samples will support product specification work and metallurgical testing. The planned program includes washing tests on bauxite that needs beneficiation and Bayer process tests to assess how material performs in refining. Alurion is also examining potential recovery of associated minerals including ilmenite, zircon and monazite.

Central District routes to export

The Central District holds the largest share of the project's direct-ship and beneficiable bauxite resources. Alurion is considering a northern route to the Port of Enseada by road and a potential southern route through the FIOL railway and Porto Sul. The study estimated road distances of about 160 kilometres from the North District and 220 kilometres from the Central District to Enseada.

The road study assessed volumes up to 11.5 million wet tonnes a year, twice the 5.75 million wet tonne base case used in the scoping study. It also assessed a less than 90 kilometre route from the Central District to a proposed rail loading point. Results described road performance at tested volumes. The company is still examining port expansion Options with the operator.

Listing proceeds and test work

Alurion issued approximately 47.6 million shares at AUD 1.05 a share in its initial public offering. The company raised AUD 50 million and joined the ASX official list on 29 July. September-quarter cash and cash equivalents were USD 28.54 million, as reported in its quarterly cash flow statement.

Much of the work described in the release is still at study stage. Data from the drilling, bulk sampling and refinery tests will be used for project design and product assessment. Engineering work at Enseada is assessing whether the port might handle up to 13.5 million wet tonnes a year.

The quarterly Cash Flow Statement showed a net operating outflow of USD 2.96 million and net financing inflow of USD 31.03 million. The financing figure includes Transaction Costs and borrowing movements alongside the IPO proceeds. Alurion's operating program is designed to give it more information about bauxite product specifications and potential recovery of associated minerals. The logistics work indicated that trucks would account for less than 1% of modelled traffic at the base-case haulage rate and 1.6% at the highest tested rate.

What to watch before mid-2027

The project timeline calls for drilling and testing results to feed into an updated resource and the pre-feasibility study. The next disclosures will show how sample results inform the proposed production schedule, specifications and logistics options. The road study gives inputs for that assessment, while port and rail options remain part of further engineering and planning.