Key Highlights

  • Mt Malcolm Mines completed 24 reverse circulation holes totalling 2,520 metres at Golden Crown during July and August 2026.
  • Post-quarter assays included six metres grading 9.28 grams per tonne gold from 31 metres in hole 26GCRC014.
  • A drilling contractor was appointed for approximately 8,500 metres of proposed drilling across three Calypso target areas.
  • Regional exploration returned rock-chip grades of up to 1.37% copper at Braiser, alongside additional targets elsewhere in the project.

Mt Malcolm Mines (ASX:M2M) advanced exploration across its Malcolm Gold Project near Leonora in Western Australia during the September 2026 quarter. The company's activities report included completion of Golden Crown drilling, preparations for a separate programme at Calypso, identification of regional targets and continuing technical assessment of a potential processing plant.

Golden Crown resource and drilling objectives

The Malcolm Gold Project comprises approximately 200 square kilometres of exploration ground east and northeast of Leonora. Golden Crown is situated around ten kilometres east of the town and contains gold-bearing quartz-vein lodes within a structurally controlled geological setting.

A mineral resource estimate announced in March 2026 reported 95,700 tonnes grading 1.50 grams per tonne gold for 4,600 ounces. This included an indicated component of 80,800 tonnes at 1.47 grams per tonne and an inferred component of 14,900 tonnes at 1.68 grams per tonne. The estimate was reported within a conceptual pit using a cut-off of 0.5 grams per tonne and extends to approximately 50 metres depth.

The July and August programme combined infill holes within known lodes with extension drilling beyond the existing resource. Targets included the northwestern and southeastern strike extensions of the Western Lode, deeper portions of the Eastern Lode and a previously undrilled southwestern corridor. The completed holes ranged in depth from 60 to 180 metres.

October assay results and western extensions

Results published on 21 October included six metres at 9.28 grams per tonne gold from 31 metres in hole 26GCRC014, incorporating one metre at 23.5 grams per tonne. Hole 26GCRC024 recorded nine metres at 3.64 grams per tonne from 12 metres, including four metres at 6.50 grams per tonne.

Of the 24 holes completed, 22 returned assays above 0.2 grams per tonne gold. Seventeen contained intervals meeting or exceeding the 0.5 grams per tonne reporting cut-off, while ten contained at least one metre grading above one gram per tonne. Extension drilling also intersected gold approximately 350 metres west of the earlier core exploration area.

The reported intersections are downhole measurements, and true widths have not yet been determined. The company used length-weighted averages, with no upper grade cut and up to one metre of internal dilution. The March mineral resource estimate predates this drilling campaign; the new assays are not themselves an updated resource estimate.

Calypso programme and regional exploration

In September, Mt Malcolm Mines appointed a contractor for planned drilling at Calypso, covering the T1, T2 and T3 targets, including Constance Lode. The programme is expected to comprise approximately 8,500 metres across around 30 collars, using Reverse Circulation Drilling and reverse circulation pre-collars with diamond tails.

Under the contractor arrangement, 50% of eligible invoiced drilling costs are payable in cash and 50% in company shares priced at AUD 0.01 each. The proposed metres and drilling schedule remain subject to operational requirements and funding.

Regional work also identified copper and gold targets at Braiser, Malcolm South, Harry's and Wool Shed. Braiser rock chips returned copper grades reaching 1.37%. Portable X-ray fluorescence readings identified coincident pathfinder anomalies at Malcolm South and Harry's, while thick cover at Wool Shed requires subsurface testing to assess the target.

Processing plant assessment and upcoming work

Technical and economic assessment of a carbon-in-pulp plant with a proposed annual capacity of 500,000 tonnes continued during the reporting period. Work includes assessing the plant's condition and potential refurbishment requirements. The company reported cash expenditure of AUD 706,000 on exploration and evaluation during the quarter.

The next phase of field activities is focused on Calypso drilling preparations and follow-up assessment of regional targets. Golden Crown results will also inform further geological work, while the processing plant remains under assessment rather than a confirmed operating facility.